Upland Zoning and ADU Guide for Homeowners
- No repairs or cleanup
- No fees or commissions
- Close on your timeline
Selling an Upland home with an ADU or garage conversion?
Get a straight cash offer, as-is, with no permit cleanup required.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team.
Upland regulates accessory dwelling units in Municipal Code Chapter 17.37, which approves complete applications ministerially within 60 days and does not require owner occupancy for ADUs created on or after January 1, 2020. This guide summarizes the code’s size, height, setback, parking, rental and fee rules and what they mean if you own or plan to sell a home with an accessory unit.
Upland ADU rules at a glance
| JADU size | Up to 500 square feet |
| Detached or attached ADU | Up to 850 square feet for a studio or one bedroom; up to 1,000 square feet for two or more bedrooms |
| Attached ADU limit | Up to 50 percent of the primary dwelling, with at least 800 square feet guaranteed |
| Height | 16 feet; 18 feet near transit, plus up to 2 feet to match roof pitch; attached ADUs 25 feet and two stories |
| Setbacks | 4 feet side and rear; 25 feet front; 15 feet on a street side of a corner lot; none for same-location rebuilds |
| Parking | One space, with exemptions; no replacement of a demolished garage |
| Rentals | 30 days or longer, with rent reporting |
| Approval | Ministerial; approve or deny within 60 days |
| Contact | Planning Division (909) 931-4130; Building and Safety (909) 931-4110; uplandadu.org |
Size and lot coverage
A detached or attached ADU can be up to 850 square feet if it is a studio or has one bedroom, and up to 1,000 square feet if it has two or more bedrooms.
An attached ADU is limited to 50 percent of the primary dwelling, but the code guarantees at least 800 square feet. A JADU is limited to 500 square feet.
Lot coverage limits follow the zone: 35 percent in RS-15 and RS-20, 40 percent in RS-10, 45 percent in RS-7.5 and in the business and mixed-use districts, and 50 percent in RS-4.
Height, setbacks and design
Detached ADUs are limited to 16 feet, or 18 feet near transit with up to 2 more feet to match the roof pitch of the main house, and an ADU on a multistory multifamily building can reach 18 feet. Attached ADUs can be up to 25 feet and two stories.
Side and rear setbacks are 4 feet, the front setback is 25 feet, and a corner lot has a 15-foot street-side setback and a clear vision triangle. No setback applies to a conversion or a rebuild in the same location and to the same dimensions.
Design standards require the roof slope to match the main house, similar exterior materials, a minimum interior dimension of 10 feet, a 7-foot wall height, an independent entrance, down-lit lighting and drought-tolerant landscaping. The code bars balconies on attached ADUs and roof decks on any ADU, and calls for screening near historic resources. Detached ADUs are one story, while attached ADUs may have two.
Parking
One parking space is required for an ADU unless an exemption applies, such as a conversion, a location near transit, or a historic district. The city cannot require replacement parking when a garage is demolished or converted. Spaces must be at least 9 by 19 feet if unenclosed or 10 by 20 feet in a garage.
Fees, utilities and fire
No impact fees apply to an ADU under 750 square feet, and fees on larger units are proportional to the main home’s square footage. Utility connection rules vary by unit type. Fire sprinklers are required for the ADU only if the primary residence needs them.
If the property is on septic, the code calls for a percolation test within the past five years, and the owner records a deed restriction on the property.
Occupancy and rentals
Owner occupancy is not required for ADUs created on or after January 1, 2020, but it is required for a JADU. Rentals must be for 30 days or longer. Upland also requires rent reporting: you submit an estimate of the rent with the permit application and report actual rent within 90 days after January 1 each year.
Approval and permits
Applications are ministerial and the city must approve or deny within 60 days, and a complete application not acted on is deemed approved. Upland offers pre-approved ADU plans and a dedicated site, uplandadu.org. See our Upland building permits guide for the permit process.
Selling an Upland home with an ADU
A permitted ADU can help a sale, while an unpermitted garage conversion or backyard unit can complicate financing and disclosure. Our statewide guides on selling as-is with unpermitted work and on capital gains on home sales cover disclosure and taxes. A cash buyer can purchase the property as it stands, with or without permits.
How to sell a house in Upland
- Find out whether your ADU, garage conversion or addition was permitted.
- Collect permits, plans and final inspection records.
- Request a no-obligation cash offer for the property as it stands.
- Choose your closing date.
- Close with no repairs or permit cleanup required.
See also: we buy houses in Upland.
Own an Upland home with an unpermitted unit? Sell as-is for cash.
Get My Cash OfferChecking an existing Upland unit against Chapter 17.37
If a lot already has a back unit, compare it with the code’s figures one at a time. Is it within 850 square feet for a studio or one bedroom, or 1,000 square feet for two or more bedrooms?
Is a detached unit one story and within the 16-foot height limit, or 18 feet near transit? Are the side and rear setbacks at least 4 feet? Does it have its own entrance and a minimum interior dimension of 10 feet?
A unit that meets these tests is easier to legalize than one that fails several, and the answers show you what a correction would involve.
Garage conversions and parking
The code does not require replacement parking when a garage is converted or demolished, and a conversion is among the situations that can be exempt from the one-space requirement. For sellers, that means a garage that was turned into living space is not automatically a zoning problem.
The open question is usually whether the conversion was permitted and inspected, because electrical, insulation, egress and smoke or carbon monoxide alarms are all part of a legal bedroom.
Rent reporting and how it shows up at sale
Upland requires you to submit an estimated rent with the permit application and report actual rent within 90 days after January 1 each year. A buyer who plans to keep the unit rented will ask whether those reports were filed. If you own a permitted ADU that you have been renting, gather the permit, the final inspection and your rent reports, and keep them with your sale file.
JADUs and the deed restriction
A junior ADU is limited to 500 square feet, and owner occupancy is required for it even though it is not required for a regular ADU created on or after January 1, 2020. The code also calls for a recorded deed restriction. If you are selling a home with a JADU, check whether that restriction was recorded and what it says, because it follows the property to the next owner.
Using the pre-approved plans and uplandadu.org
The city offers pre-approved ADU plans and a dedicated website, uplandadu.org. Even if you are selling rather than building, the site is a useful reference: it shows what a compliant unit looks like in Upland, which helps you judge how far an existing structure is from the standard. You can also call Planning at (909) 931-4130 or Building and Safety at (909) 931-4110.
Frequently asked questions
How big can an ADU be in Upland?
Up to 850 square feet for a studio or one bedroom and 1,000 for two or more bedrooms; JADUs up to 500; attached ADUs up to 50 percent of the main home with at least 800 square feet guaranteed.
Do I have to live on the property?
Not for ADUs created on or after January 1, 2020. A JADU requires owner occupancy.
Does Upland require rent reporting?
Yes. Submit an estimated rent with the permit application and report actual rent within 90 days after January 1 each year.
How long does approval take?
The city must approve or deny a complete application within 60 days.
Can I sell my Upland home if the ADU is unpermitted?
Yes. Disclose it and sell as-is, including to a cash buyer.
How long does Upland have to act on an ADU application?
Upland’s code requires approval or denial within 60 days of a complete application, and a complete application not acted on is deemed approved.
Is owner occupancy required for an Upland ADU?
Not for ADUs created on or after January 1, 2020, but it is required for a JADU.
More guides
- We Buy Houses in Upland
- We Buy Houses in San Bernardino County
- San Bernardino County Property Tax Guide
- Upland Building Permits Guide
- All California Guides
Sources
- City of Upland Municipal Code, Chapter 17.37 Accessory Dwelling Units
- City of Upland: Planning Division
- California HCD: Accessory Dwelling Units
This guide is general information from public sources, not legal advice. Confirm current rules with the City of Upland.
