Upland Building Permits Guide for Homeowners
- No repairs or cleanup
- No fees or commissions
- Close on your timeline
Selling an Upland home with unpermitted work?
Get a straight cash offer, as-is, with no permit cleanup required.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team.
Upland’s Building and Safety Division enforces the 2025 California Building Code and Upland Municipal Code Title 15, and a city handout lists the projects that need a permit, from room additions and re-roofs to water heater changeouts and window replacements. This guide covers who can pull a permit, how to apply and what unpermitted work means when you sell.
Upland permits at a glance
| Office | Building and Safety Division, 460 N. Euclid Avenue, Upland, CA 91786 |
| Phone | (909) 931-4110; permit technician line, option 1 |
| Codes | 2025 California Building Code and Upland Municipal Code Title 15 |
| Design criteria | Elevation 1,500 feet; wind 110 mph, Exposure C; rainfall 4 inches per hour; climate zone 10 |
| Construction hours | Weekdays 7:00 a.m. to 6:00 p.m. |
| Online | Citizen Self Service portal; public records through NextRequest |
| Who can pull permits | A licensed contractor or the owner (owner-builder) |
Projects that need a permit
The city’s “Do I Need a Building Permit” handout lists these as requiring a permit: accessory dwelling units, decks and patio covers, demolition, electrical work, fences and walls over 6 feet, fireplaces, retaining walls over 3 feet, room additions, garage conversions, HVAC changeouts, new construction, plumbing repipes, remodels, siding and stucco, solar, sheds over 120 square feet, re-roofing, pools and spas, water heater changeouts, utility lines, and window and door replacements.
Work that may be exempt
The city publishes a form titled Work Exempt From Permit. Even when the building code does not require a permit, Planning approval can still be required, for example for setbacks, height or placement of accessory structures. Ask the division to confirm in writing when you are unsure.
Who can pull a permit
Permits can be obtained by a licensed contractor or by the property owner acting as owner-builder. If someone else applies for you, the city requires a notarized City of Upland authorization letter at issuance. Contractors need a valid state license and a city business license.
Codes, design criteria and construction hours
Plans must meet the 2025 California Building Code and Title 15 of the Upland Municipal Code, with local design values for elevation, wind, rainfall, seismic design category and climate zone. Construction noise is limited to weekdays between 7:00 a.m. and 6:00 p.m., so schedule loud work accordingly.
Applying and inspections
Applications are submitted through the Citizen Self Service portal or at the counter. After plan approval and permit issuance, request inspections as work progresses and keep the permit card on site. Public records requests, such as asking for a property’s permit history, go through the city’s NextRequest portal. A permit history can show whether a garage conversion, addition or ADU was finalized.
ADUs and unpermitted work
ADUs have their own rules in Chapter 17.37, which we summarize in the Upland zoning and ADU guide. Work done without a permit can lead to a notice from the city, double fees and opening walls for inspection.
Selling an Upland house with unpermitted work
California sellers must disclose known unpermitted work, and a buyer’s lender or insurer may ask about permits. Our statewide guides on selling as-is with unpermitted work and capital gains on home sales explain disclosure and taxes. A cash buyer can purchase the home as it stands.
How to sell a house in Upland
- Gather any permits, plans and final inspection records.
- List work that may have been done without a permit.
- Request a no-obligation cash offer for the property as it stands.
- Choose your closing date.
- Close with no repairs or permit cleanup required.
See also: we buy houses in Upland.
Own an Upland home with unpermitted work? Sell as-is for cash.
Get My Cash OfferHow to look up the permit history of an Upland address
Before you decide how to handle old work, find out what the city actually has on file. Upland routes public records requests, including requests for a property’s permit history, through its NextRequest portal, and permit applications and inspection activity run through the Citizen Self Service portal.
For questions about a specific record, the Building and Safety permit technician line is (909) 931-4110, option 1. When you ask, give the full street address and the approximate year of each project, and ask for permits that were issued, finaled and expired.
A permit that was issued but never finaled is a different problem from work that was never permitted at all.
Checking the city’s permit list against your own house
The city’s handout is useful as a checklist. Among the items it says need a permit are water heater changeouts, HVAC changeouts, window and door replacements, re-roofing, plumbing repipes, siding and stucco, solar, garage conversions and room additions.
Those are the improvements that most often turn up in a house that has changed hands several times. Walk through your own property with that list: Is the water heater newer than the house? Were the windows replaced?
Is there a patio cover, a converted garage or a room that does not appear on the original floor plan? Each “yes” is a question to answer with a permit record, an invoice or a contractor’s name.
Keep in mind the handout also covers fences and walls over 6 feet, retaining walls over 3 feet and sheds over 120 square feet, so a backyard improvement can need a permit even when it feels small.
Owner-builder work and selling
Upland allows permits to be pulled by a licensed contractor or by the owner as owner-builder. If you did permitted work yourself, make sure it reached final inspection.
California’s contractor licensing law also treats an owner who builds and then sells soon after as potentially building for sale rather than for their own use, which can limit the owner-builder exemption.
If you are planning a sale, ask the Building and Safety Division and, where the stakes are high, a licensed professional how that rule applies to your project before you start work you intend to sell within a short time.
Choosing a path before you list
If you find unpermitted work, there are usually four realistic paths: apply for a permit and bring the work into compliance, remove it, disclose it and offer a credit, or sell to a buyer who takes the house as-is. Each trades money, time and certainty differently.
Legalizing can add value but means plan review, inspections and possible corrections. A cash purchase gives certainty and speed, and the offer already accounts for what the buyer will need to do.
Reading your own permit history before a buyer does
Call Building and Safety at (909) 931-4110 and ask what is on record for the address. Note each permit’s description, date and whether it was finaled. Then walk the house and compare. A converted garage, an enclosed patio or a panel with more circuits than the original are the usual gaps. Knowing the record first gives you time to decide whether to legalize, credit or sell as-is.
ADU permits and the 60-day clock
Upland’s ADU code approves complete applications ministerially within 60 days, and the dedicated site uplandadu.org explains the process. If you are legalizing a back unit, a complete application matters because the 60 days run from completeness, not from first contact.
What an as-is buyer changes
An as-is buyer does not require permits to be closed before closing, but you still disclose known unpermitted work on the Transfer Disclosure Statement. The difference is that the price reflects the gap, and you avoid the delay of plan check, corrections and re-inspection.
Frequently asked questions
Do I need a permit to replace a water heater in Upland?
Yes. The city’s handout lists water heater changeouts, HVAC changeouts, re-roofing and window and door replacements as permit projects.
Can I pull my own permit?
Yes, as an owner-builder or through a licensed contractor. An agent needs a notarized authorization letter.
What are Upland’s construction hours?
Weekdays 7:00 a.m. to 6:00 p.m.
Do sheds need a permit?
Sheds over 120 square feet do, and Planning approval can apply to smaller ones.
Can I sell an Upland home with unpermitted work?
Yes. Disclose it and sell as-is, including to a cash buyer.
How do I get the permit history for my Upland house?
Submit a request through the city’s NextRequest public records portal, or call the Building and Safety permit technician line at (909) 931-4110, option 1, to ask what is on file.
Do I need a permit to replace windows or a water heater in Upland?
The city’s handout lists window and door replacements and water heater changeouts among the projects that need a permit.
Who do I call about an Upland permit?
Building and Safety at (909) 931-4110. Planning is at (909) 931-4130.
Does Upland have a site for ADUs?
Yes. The city offers pre-approved ADU plans and a dedicated site, uplandadu.org.
More guides
- We Buy Houses in Upland
- We Buy Houses in San Bernardino County
- San Bernardino County Property Tax Guide
- Upland Zoning and ADU Guide
- All California Guides
Sources
This guide is general information from public sources, not legal advice. Confirm current rules with the City of Upland.
