Westminster Zoning and ADU Guide for Homeowners
- No repairs or cleanup
- No fees or commissions
- Close on your timeline
Selling a Westminster home with an ADU or garage conversion?
Get a straight cash offer, as-is, with no permit cleanup required.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team.
Westminster’s Planning Division walks ADU applicants through a four-step process and points to specific Zoning Code topics for development standards, with plans submitted to the Building Division in person or through the Westminster Build portal. This guide explains what the city’s ADU page says, how California law fills in gaps the page leaves open, and what to check if your house already has a converted garage or backyard unit.
Westminster ADU rules at a glance
| Where the standards live | Westminster Zoning Code, including the ADU development standards topic 17-4-17.400.135 |
| Related Zoning Code topics | Residential district development standards (17.210.015), single-family residential standards (17.400.120) and detached accessory structure standards (17.400.130) |
| State law referenced | California Health and Safety Code sections 17958.1 and 18007 |
| How to apply | Submit plans to the Building Division in person or through the Westminster Build portal |
| Planning Division | (714) 548-3247, planning@westminster-ca.gov |
| Development Engineering | (714) 548-3465 or (714) 548-3466 |
| Fee references | ADU Park Fee Resolution No. 5057 and the Residential Parks Development Impact Fee, both linked from the city page |
| Size, setbacks and parking | Not stated on the city page itself; see the Zoning Code topics above and confirm with Planning |
The four-step process the city describes
The city’s page lays out the path in four stages.
First, consult and design: decide whether the project is feasible, consider hiring an architect or designer, talk to the Planning, Building and Engineering divisions, design to the Zoning Code and flood zone requirements, check for no-build easement areas and review the application packet.
Second, prepare construction plans that follow the California Building Code and Fire Code, with Title 24 energy calculations. Third, submit the complete plan set and supplemental documents to the Building Division. Fourth, build after the permit is issued, with inspections along the way.
Where the numbers are
The page does not restate maximum size, height, setbacks or parking. Instead, it links to Zoning Code topics: the ADU development standards, the residential district standards, the single-family residential standards and the detached accessory structure standards.
Read all four, because an ADU on a single-family lot is judged against several sets of rules at once. If the code text and your site plan do not obviously agree, ask Planning to confirm in writing.
What state law adds
California law sets floors that cities must follow, regardless of local wording.
Under Government Code section 65852.2, cities generally must review a complete ADU application ministerially within 60 days, and may not apply standards that fail to allow at least an 800 square foot ADU at least 16 feet high with four-foot side and rear setbacks.
Junior ADUs, which are limited to 500 square feet and carved out of an existing home, are governed by section 65852.22. The state housing department publishes a handbook that explains these rules, and it is worth reading beside the city’s code.
Treat these state figures as a baseline and confirm current text, because ADU law has been amended repeatedly.
Flood zones and easements
The city specifically tells applicants to design in compliance with flood zone requirements and to check no-build easement areas. In practice, that means looking at your parcel map and title documents before you sketch a footprint. A drainage or utility easement across the back of a lot can eliminate the spot you had in mind, and Development Engineering is the office that can tell you.
Fees
The page links to the ADU Park Fee Resolution No. 5057 and to a Residential Parks Development Impact Fee document. We did not read the amounts, so we do not state them. Ask for a written estimate that lists every city fee for your project, including plan check, permit and park fees, and utility connection charges if any apply.
Step by step: starting an ADU in Westminster
1. Confirm your lot qualifies
Bring your address and a rough sketch to the Planning Division and ask which standards apply to your zone and lot.
2. Check easements and flood status
Review your title report or survey and ask Development Engineering about any flood zone or no-build easement affecting the site.
3. Hire a designer and prepare plans
Choose an architect or designer familiar with Orange County projects, and ask for plans that meet the building and fire codes and Title 24.
4. Submit to the Building Division
Submit the complete set in person or through Westminster Build, together with the supplemental documents listed in the application packet.
5. Build, inspect and finalize
Schedule inspections as work proceeds and keep the final sign-off. A finaled ADU is much easier to sell than an unfinished one.
Unpermitted units and garage conversions
Many Orange County homes have a converted garage or a backyard unit that predates current rules. If a structure was built without permits, the city can require you to correct it or permit it. Because state law has made it easier to legalize certain units, it is worth asking Planning whether yours could qualify before deciding whether to fix it or sell without fixing it.
Choosing between permitting, legalizing and selling as-is
An owner with an older converted garage usually faces three realistic paths. The first is to permit and finalize the unit, which can add rental income and appeal but requires plans, inspections and fees.
The second is to leave it alone and disclose it at sale, which is simple but may narrow the pool of financed buyers. The third is to sell as-is to a buyer who accepts the structure as it stands.
The right choice depends on what the Building Division says it would take, how much time you have and what the house needs otherwise.
A useful first move is to ask Planning and Building for the permit history of your address and compare it with what is physically on the lot. Then ask whether the structure could be approved under current rules. That conversation costs little and gives you real numbers instead of guesses.
Documents to gather before you talk to the city
- A recent survey or plot plan, with easements marked
- Your title report or grant deed
- Photos of the existing structure inside and out
- Any earlier plans, permit cards or contractor invoices
- A sketch of what you want to build or keep
ADUs and selling a Westminster house
A permitted ADU can add rental income and buyer appeal, while an unpermitted one can complicate financing and appraisal. Because an ADU generally cannot be sold separately from the main home, its value comes only through the sale of the whole property. See our unpermitted work guide and Prop 13 guide. If you own a Westminster house with an old backyard unit or garage conversion:
- Find out what the city has on file for each structure.
- Ask whether current ADU rules would allow what is there.
- Get a rough cost to correct and permit it.
- Decide whether legalizing first or selling as-is fits your timeline.
How to sell a house in Westminster
- Pull your permit history and note any additions, conversions or open permits.
- Collect permits, final inspection sign-offs and any city notices.
- Request a no-obligation cash offer for the house as it stands.
- Choose your closing date.
- Close with no repairs, permit cleanup or showings required.
Our local pages cover related situations in Westminster, including selling as-is and selling an inherited house. See also our Westminster page and the Orange County hub.
Own a Westminster home with an ADU or garage conversion? Sell as-is for cash.
Get My Cash OfferFrequently asked questions
How do I start an ADU in Westminster?
The city describes four steps: consult and design, prepare construction plans, submit to the Building Division, then build with inspections. Start by contacting the Planning Division at (714) 548-3247.
Where are Westminster’s ADU size and setback rules?
The city page links to Zoning Code topics rather than listing numbers, including 17-4-17.400.135 for ADU development standards. Confirm current limits with Planning.
How do I submit ADU plans in Westminster?
The city says to submit the complete plan set and required supplemental documents to the Building Division in person or through the Westminster Build online portal.
Does Westminster charge a park fee on ADUs?
The city page links to an ADU Park Fee Resolution (No. 5057) and a Residential Parks Development Impact Fee document. Ask for a written fee estimate for your project.
What does state law require for ADU review?
California Government Code section 65852.2 generally requires cities to review complete ADU applications ministerially within 60 days. Confirm current text, since the law changes often.
Can I sell my Westminster house with an unpermitted ADU?
Yes. You can disclose it and sell as-is, including to a cash buyer. Our statewide guide explains disclosure.
More guides
- We Buy Houses in Westminster
- We Buy Houses in Orange County
- Orange County Property Tax Guide
- Westminster Building Permits Guide
- Westminster Code Enforcement Guide
- Garden Grove Building Permits Guide
- Seal Beach Building Permits Guide
- All California Guides
Sources
- City of Westminster: Accessory Dwelling Units
- City of Westminster: Building Division
- California HCD: Accessory Dwelling Unit Handbook
- California Government Code section 65852.2
This guide is general information from public sources, not legal advice. Confirm current rules, fees and hours with the city.
