Hollister regulates accessory dwelling units under Municipal Code Chapter 17.23, with an ordinance summary that sets size caps, a 16-foot height limit for detached single-family ADUs, 4-foot side and rear setbacks and a 60-day ministerial approval clock. This guide summarizes the city’s published ADU rules, the Planning-then-Building application path, the deed restriction that must be recorded with the San Benito County Recorder, and what to do if your home has a garage conversion or an older unpermitted unit.
Hollister ADUs at a glance
| Planning contact | planning@hollister.ca.gov |
| Municipal code | Hollister Municipal Code Chapter 17.23; height and setbacks refer to Section 17.04.030 |
| JADU size | Up to 500 square feet, inside an existing or proposed single-family home |
| Detached or attached ADU size | Up to 1,000 square feet; 850 square feet for a one-bedroom unit; attached units up to 50% of the primary dwelling |
| Detached ADU height | 16 feet (single-family); 18 feet (multifamily detached) |
| Side and rear setbacks | 4 feet for detached and attached ADUs |
| Spacing between structures | 6 feet for detached ADUs |
| Review time | Notice of Completeness within 30 days; ministerial approval within 60 days of a complete application |
Size, height and setbacks
The city’s ADU ordinance summary, revised March 2023, sets different limits by type of unit. A junior ADU (JADU) is capped at 500 square feet.
A conversion, detached or attached ADU on a single-family lot is generally capped at 1,000 square feet, or 850 square feet if it has only one bedroom, and an attached ADU or conversion may also be limited to 50% of the floor area of the primary dwelling. Multifamily conversions and detached units are capped at 1,000 square feet as well.
For height, a detached single-family ADU is limited to 16 feet and a detached multifamily ADU to 18 feet; other types follow the zone’s height rules in Section 17.04.030. Detached and attached ADUs need 4-foot side and rear setbacks, and a detached ADU must be 6 feet from other structures. Front setbacks follow the underlying zone. Conversions of existing space use the zone’s setbacks as they already exist.
Parking, owner occupancy and rentals
The summary calls for one parking space for an ADU with one or more bedrooms, but it says parking is not required for an ADU created within the existing primary dwelling, and replacement parking is not required when a garage, carport or covered parking structure is converted.
Owner occupancy is required for a JADU. For other ADUs, the summary says owner occupancy is not required for ADUs permitted between January 1, 2020 and January 1, 2025, so check the current ordinance for anything permitted later. Short-term rentals are prohibited for all ADU types in the summary.
Impact fees and utilities
The summary says no impact fees apply to a JADU, and none apply to an ADU of 749 square feet or less. ADUs of 750 square feet or more pay impact fees proportional to the square footage of the existing dwelling.
A separate utility connection is required for any ADU that is not created from existing space; an owner may also choose to install one, in which case the city says a connection fee equal to the cost of installing the meter applies, and the Engineering Department at (831) 636-4340 has the current water meter connection fee.
The Hollister ADU path, step by step
1. Research
Review the ADU Guidelines, the ADU Submittal Checklist and Hollister Municipal Code Chapter 17.23.
2. Hire professionals
The city says to use a licensed architect, designer or engineer and a licensed contractor, and notes that it cannot recommend any of them.
3. Planning entitlement
Schedule a submittal appointment with the Planning Division, submit and pay for the ADU planning application with the matching deed restriction form (single-family or multifamily ADU, or JADU), and wait through the 30-day completeness review. After comments and corrections, record the deed restriction with the San Benito County Recorder’s Office.
4. Building permit
Schedule a Building Division submittal appointment, submit the building permit application and pay plan check fees, answer comments, then pay permit issuance fees.
5. Construction and final
Pass inspections, pay any impact fees and receive the certificate of final occupancy. The city’s page says no pre-approved ADU plans are currently available.
Garage conversions and unpermitted units
Garage conversions and occupied sheds appear on the city’s code enforcement list, so an unpermitted unit can lead to both a notice and a permit-history problem at sale. The ADU path above is the usual way to legalize space.
Because owners must record a deed restriction with the county recorder, a legalized ADU also leaves a paper trail that buyers and title companies will see. Our Hollister code enforcement guide and building permits guide explain the related steps, and our county recorder guide explains recording.
State ADU law and Hollister
California’s ADU statute, Government Code section 66314 and following, sets a floor that every city must follow, and local ordinances fill in the details.
The state requires ministerial review within 60 days of a complete application, bars a city from requiring more than a limited set of standards, and generally allows an ADU or conversion inside existing space without added setbacks.
The California Department of Housing and Community Development (HCD) publishes a handbook and keeps a list of the state requirements. Because state law changes often, treat the city’s current ordinance and handout as the final word on size, height, parking and fees for your lot.
ADUs, garage conversions and selling a Hollister house
Many older homes have a converted garage or a backyard unit built without permits. Buyers and lenders ask about them, and California sellers generally disclose known unpermitted work. Our guide to selling as-is with unpermitted work explains the rules, and our Prop 13 guide explains how new construction can affect property tax. Before you list:
- Check city records for permits on any ADU, conversion or addition.
- Ask Planning whether the structure could qualify under current rules.
- Estimate plans, fees and corrections needed to legalize it.
- Compare that with selling as-is and letting a cash buyer take on the legalization.
Questions to ask Planning before you design
- Does my lot and zone allow an ADU, a junior ADU, or both?
- Is a pre-approved or pre-reviewed ADU plan available?
- What are the current impact, utility and school fees for the size I am considering?
- Can my existing garage or accessory structure be converted without changing its footprint?
- Are there fire, slope, easement or utility constraints on my lot?
Junior ADUs and garage conversions in more detail
State law treats a junior ADU as a unit of up to 500 square feet created inside the walls of an existing or proposed single-family home, with an efficiency kitchen and a recorded restriction that keeps it from being sold apart from the house.
A garage conversion is a different path: the unit replaces the garage, and state law generally does not require the city to demand replacement parking. Both are common sources of unpermitted space in older Hollister neighborhoods, which is why buyers’ agents and appraisers ask for the permit record.
If a conversion was done without a permit, the usual fix is to submit as-built drawings, pay the fees and pass inspection, which can take months and cost real money.
Fees, utilities and property tax
State law limits the impact fees a city can charge on smaller ADUs and on conversions of existing space, and it limits when a separate utility connection can be required.
Larger new units can still carry impact fees, school fees and water or sewer connection charges, so ask for an itemized estimate before you commit to plans. New construction is generally reassessed for property tax under Prop 13, which means an ADU can raise the bill for the whole property. Our Prop 13 guide explains how reassessment works.
Why ADUs matter for resale
A permitted ADU can add rental income and appeal for some buyers, but an unpermitted one can complicate financing and appraisal. Lenders typically want permitted living area, and an appraiser may not count unpermitted space.
Because an ADU generally cannot be sold separately from the main home, its value comes through the sale of the whole property.
If you inherited a house with an old backyard unit, or bought one with a converted garage, check what the city has on file before you decide how to sell. Our probate home sale guide covers inherited property.
How to sell a house in Hollister
- Ask the city for the permit record on any ADU or conversion.
- Collect plans, inspection records and any city notices.
- Request a no-obligation cash offer for the house as it stands.
- Choose your closing date.
- Close with no repairs, legalization or showings required.
See also our Hollister page, the Hollister cash offer process, the San Benito County hub and the San Benito County recorder and deed transfer guide.
Own a Hollister home with an ADU or garage conversion? Sell as-is for cash.
Get My Cash OfferFrequently asked questions
What is the maximum ADU size in Hollister?
The city’s ordinance summary lists up to 1,000 square feet for most ADUs and 850 square feet for a one-bedroom ADU. A JADU is capped at 500 square feet.
How tall can a detached ADU be in Hollister?
The summary lists 16 feet for a detached single-family ADU and 18 feet for a detached multifamily ADU.
What setbacks apply to a Hollister ADU?
Detached and attached ADUs need 4-foot side and rear setbacks, and a detached ADU needs 6 feet from other structures. Front setbacks follow the zone.
How long does the city take to approve an ADU?
The summary says a Notice of Completeness is provided within 30 days of submittal and ministerial approval is issued within 60 days of a complete application.
Does Hollister have pre-approved ADU plans?
The city’s ADU page says no pre-approved plans are currently available.
Can I sell my Hollister house with an unpermitted ADU or garage conversion?
Yes. You can disclose it and sell as-is, including to a cash buyer. Our statewide guide explains the disclosure rules.
More guides
- We Buy Houses in Hollister
- We Buy Houses in San Benito County
- San Benito County Property Tax Guide
- Hollister Building Permits Guide
- Hollister Code Enforcement Guide
- All California Guides
Sources
- City of Hollister: Accessory Dwelling Units
- City of Hollister: Accessory Dwelling Unit Ordinance Summary