Newport Beach Residential Building Records (RBR) Report: What Home Sellers Need to Know

California Cash Home Buyers
Cash Offer in 24 Hours
  • No RBR report, open corrections, unpermitted work: we buy it as-is
  • Zero fees, zero commissions, zero closing costs
  • No obligation — turn the offer down and owe us nothing

Selling a Newport Beach House Without the RBR Hassle?

You can sell without a city inspection or a list of corrections. Tell us about the house and get a written cash offer.

Call or Text  (424) 435-2326


Last updated November 17, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from the City of Newport Beach Community Development Department and Newport Beach Municipal Code Chapter 15.15; sources are listed at the end.

Newport Beach no longer requires a Residential Building Records (RBR) report to sell a home. The City Council adopted Ordinance 2023-22 on November 28, 2023, which amended Municipal Code Chapter 15.15 and made the report voluntary. An owner can still order one for a flat $244 fee (checked 2026-11-17), with or without a city inspection, and many buyers and agents still ask for it.

Newport Beach RBR report at a glance

Official nameReport of Residential Building Records (Municipal Code Chapter 15.15). The City also calls it a Residential Building Report or RBR.
Required to sell?No. Voluntary since Ordinance 2023-22, adopted November 28, 2023.
What it containsPermit history and zoning information for the property, plus inspection findings if the owner allows an inspection
Application fee$244 flat fee, paid with the application (checked 2026-11-17)
Reinspection fee$183, charged only if a scheduled appointment is missed without advance notice (checked 2026-11-17)
City inspectionOptional. The owner must authorize or decline it on the application.
Processing timeThe City has 30 days to issue the report after a complete application and fee
How long it is validOne year from issuance, if there is no unpermitted work and no change of ownership
How to applyOnline only, through the City’s CiViC portal (since September 1, 2024)
Corrections deadline30 days from the inspection, if the inspector notes corrections

What is a Residential Building Records report in Newport Beach?

It is a report the City prepares about one residential property. The Municipal Code defines it as a report describing the zoning of the residential building, the number of dwelling units the zoning allows, and other information about the use, occupancy and construction of the building.

The City describes the RBR as having two parts. The first is the report itself, which lists the permit history and zoning classification. The second is a field inspection, which the owner can decline.

A “residential building” under Chapter 15.15 is any structure that contains a dwelling unit. It also covers accessory structures and the land the building sits on. So a detached garage, a pool or a guest unit is part of what the report looks at.

Is the RBR report required before you sell?

No. Until late 2023 the City required it for most sales of previously occupied homes. Ordinance 2023-22 changed that. The code now says the owner “may obtain” a report from the City upon entering into an agreement of sale.

The code explains why. The City Council found that these reports help reduce code violations, but that requiring them can disrupt the sale of residential property. It decided a voluntary program made more sense.

Older articles, escrow checklists and some agent forms still describe the RBR as mandatory. If someone tells you the City requires it, point them to the update notice at the top of the City’s RBR Information page.

Why do sellers still order one?

Mostly because the buyer asks. The City’s own FAQ says a city inspection is not required but that most buyers insist on one. A buyer paying Newport Beach prices wants to know whether the bonus room, the converted garage or the second unit has permits.

The report also helps the seller. It shows what the City has on file before a buyer finds it. If the records show three bedrooms and the listing says five, you want to know that at listing, not in the last week of escrow.

The trade-off is that an inspection can create work. If the inspector finds violations, the report records them, and the City expects corrections within 30 days.

When in the sale should you apply?

The code ties the report to an agreement of sale. The City says the owner has the option of applying no later than three days after entering into that agreement. City staff recommend applying when the property is listed instead.

The reason is time. The City has up to 30 days to process a report. Staff say they typically research the records and deliver the report to the inspector within 3 to 5 business days, but the inspection, any corrections and any reinspection come after that. Applying at listing leaves room to finish before escrow closes.

A report is good for one year from the date it is issued. That holds only if no unpermitted work happens in that period and the property has not changed owners.

How much does the RBR cost?

The application fee is a flat $244, due with the application (checked 2026-11-17 on the City’s RBR Information page). The fee is the same whether you accept or decline the inspection.

There is no separate charge for a normal reinspection. The City says the initial fee covers it. A $183 reinspection fee may be charged if a scheduled appointment is missed without advance notice (checked 2026-11-17).

An older PDF application form on the City’s site still shows $214 and $142. Those numbers are out of date. The City now takes applications only online, and the portal will show the current amount at checkout.

Refunds are limited. Under Chapter 15.15, the City refunds the fee only if you ask in writing before staff review the records, and it keeps 20 percent as an administrative charge. After the records review or the inspection, there is no refund.

How do you apply for an RBR?

  1. Create a CiViC account. CiViC is the City’s online permitting portal. Since September 1, 2024, the City accepts new RBR requests only through it.
  2. Fill out the Residential Building Report application. The owner or an authorized agent can apply. The City returns incomplete applications.
  3. Authorize or decline the inspection. You have to pick one. The application must be signed either way.
  4. Pay the $244 fee with the application.
  5. Wait for the records research. Staff typically finish it in 3 to 5 business days.
  6. Schedule the inspection, if you authorized one. A Code Enforcement Officer calls to set the time. The owner, the owner’s agent or the buyer has to be there.
  7. Make any corrections and have them reinspected or self-cleared.
  8. Deliver the finished report. Under the code, the owner or the owner’s representative delivers the completed report to the other side of the sale.

For questions about an inspection, the City lists the RBR inspectors at (949) 644-3215 and rbrinspections@newportbeachca.gov. Its form says email is the preferred way to reach them.

What does the city inspector look at?

The inspector compares the City’s records with what is visible at the property. The City says the emphasis is on verifying zoning and permit records and pointing out obvious life safety hazards. Its inspection checklist (dated September 10, 2024) lists these items, among others:

  • Number of legal living units per building
  • Proper size parking area in the garage
  • Structures encroaching into setbacks
  • Additions or alterations without proper building permits
  • Smoke and carbon monoxide detectors
  • Emergency egress from bedrooms, and security bars over egress windows
  • Water heaters strapped
  • Self-closing fire door between the house and garage
  • Handrails, guardrails and stairs
  • Pool safety barrier
  • Faulty electrical wiring and extension cords used as permanent wiring
  • Plumbing leaks
  • Visible house numbers

The checklist notes that the inspector may call out corrections that are not on the list.

Small items can sometimes be handled without a second visit. The City has a voluntary Self-Clearing RBR Inspection Corrections form for relatively minor violations, such as a missing water heater strap, smoke detector or handrail. The owner signs it and agrees to fix the items.

What happens if the inspection finds violations?

The report will list them. Chapter 15.15 says the report shall include evidence of building permit or zoning code violations observed during the inspection, and the correction of those violations as confirmed by reinspection.

The City says all noted corrections must be made within 30 days of the inspection. When they pass reinspection, the report is signed for final approval.

A buyer can agree to take over the corrections. The City says the agent or seller has to tell the buyer that accepting the corrections means taking on the duty to make them in a timely manner. It also says it will pursue all available means to make sure corrections are made.

This is the real risk of authorizing an inspection. An unpermitted addition or an illegal second unit that nobody had flagged becomes a documented violation with a deadline. Our Newport Beach code enforcement guide explains how the City handles open cases.

What if you decline the inspection?

You still get the records portion. The City stamps the report “Inspection Declined” and mails it to the owner. The code says the report will state that the City did not inspect the building.

The City adds one step. It says the owner must deliver a copy of the application showing the refusal to the other party to the sale within three days of filing it with the City.

A declined inspection is not a violation. A buyer will see the stamp, though, and may read it as a reason to hire a private inspector or to ask more questions about permits.

What happens if you skip the RBR entirely?

The City does not penalize you for not ordering one. The program is voluntary, and the current text of Chapter 15.15 that we read contains no fine for selling without a report.

Skipping the report does not change what you owe the buyer under state law. California sellers generally have to disclose known problems with a property, and unpermitted work you know about is one of them. Our guide to selling a house with unpermitted work in California covers that in more detail.

The practical cost is on the buyer’s side. A financed buyer or a careful agent may make the RBR a term of the purchase contract. At that point it is a contract requirement between you and the buyer, even though the City does not require it.

Which transfers were exempt under the old rule?

The City’s RBR page still lists transfers for which a report “is not required.” The list includes:

  • The first sale of a residential building that has never been occupied
  • Transfers under a court order, including probate, bankruptcy and eminent domain
  • Foreclosure sales and transfers to a lender by a borrower in default
  • Transfers by a fiduciary administering a guardianship, conservatorship or trust
  • Transfers from one co-owner to another
  • Transfers between spouses under a divorce or legal separation decree
  • Transfers to a governmental entity
  • Refinancing
  • Transfers by an owner into a family or living trust

Since the report is now optional for every sale, this list matters less than it used to. It is still useful if a buyer or escrow officer is working from an old checklist. If you are selling an estate property, see our page on selling an inherited property.

How does the RBR work in an as-is or cash sale?

In an as-is sale, the seller does not agree to make repairs. Because the RBR is voluntary, an as-is seller in Newport Beach can skip the report, or order it and decline the inspection, and still close.

Whether that works depends on the buyer. A buyer using a loan often wants the report and the inspection, and may want corrections finished before closing. A cash buyer can decide to go without it, or can agree in writing to take over any corrections after closing.

We buy houses this way. We check the permit history ourselves, price in any unpermitted work, and do not ask the seller to order an RBR or fix what an inspector might find. You still disclose what you know. See how we buy houses in Newport Beach and across Orange County.

Not sure whether to order the report or what it might turn up? Call (424) 435-2326 or request a cash offer. There is no cost and no obligation.

Newport Beach RBR report FAQ

Do I need an RBR report to sell my house in Newport Beach?

No. The City made the report voluntary when it adopted Ordinance 2023-22 on November 28, 2023. A buyer can still ask for one as a term of the purchase contract.

How much does a Newport Beach RBR report cost?

The application fee is a flat $244, paid with the application. A $183 reinspection fee may apply if you miss a scheduled appointment without advance notice. Both figures were checked on 2026-11-17.

Can I get the report without a city inspection?

Yes. The owner must authorize or decline the inspection on the application. If you decline, the City stamps the report Inspection Declined and mails it to you.

How long does it take to get an RBR?

The Municipal Code gives the City 30 days after a complete application and fee. The City says staff typically finish the records research in 3 to 5 business days, and the inspection is scheduled after that.

How long is an RBR report valid?

One year from the date of issuance, as long as no unpermitted work is done and the property has not changed owners.

What if the inspector finds unpermitted work?

The report will list it, and the City says corrections must be made within 30 days of the inspection. A buyer can agree to take over the corrections, but the seller or agent must disclose that the buyer is then responsible for making them.

Where do I apply for a Newport Beach RBR?

Online through the City’s CiViC portal. Since September 1, 2024, the City accepts new requests only through the portal. The owner or an authorized agent can apply.

Sources

This guide is general information, not legal advice. Rules and fees change; confirm with the City of Newport Beach Building Division or the RBR inspectors at (949) 644-3215 before you rely on any figure here.

From the Blog

Latest guides for California home sellers