Redwood City now accepts building permit applications electronically only, and the city says a permit stays valid for 365 days from issuance. This guide explains how the Redwood City Building Division works for homeowners: when a permit is needed, how to submit, what review times the city publishes, how inspections and permit expiration work, and what permit history means when you sell.
Redwood City permits at a glance
| Department | Building Division, Building and Code Enforcement, 1017 Middlefield Road, Redwood City, CA 94063 |
| Phone | (650) 780-7350 (fax (650) 780-7348) |
| permits@redwoodcity.org | |
| How to apply | Electronic submittal through the city’s eTrakIt portal |
| Inspection request line | (650) 780-7361 |
| Permit validity | 365 days from issuance, extended 365 days by each passed field inspection |
| Weekday construction hours | 7 a.m. to 8 p.m., Monday through Friday |
When you need a building permit in Redwood City
The city’s Building FAQs say a building permit is required for all work that is not listed as exempt in section 105.2 of the California Building Code, and they urge owners to read that entire section before deciding that a project is exempt.
In practice, anything that changes the structure, the electrical system, plumbing or mechanical equipment of a house is usually permit territory, while cosmetic finish work generally is not. When the answer is unclear, the Building Division at (650) 780-7350 is the place to ask before you start.
The city is just as direct about work that was already done without approval: a permit must be obtained to legalize any work completed without permits.
That means plans for all of the work submitted for review and approval, and once the permit is issued, a full inspection to verify code compliance.
The city warns that inspectors may require demolition of finishes and wall coverings so they can confirm the work matches the approved plans and meets current code. For an owner thinking about selling, that is the real cost of an unpermitted room, bathroom or garage conversion.
How to submit a permit application
1. Prepare your documents
Redwood City is only accepting electronic permit and plan applications. Documents should be submitted as a PDF or Word file, and the city asks that every file name include the project address. A building application, for example, should carry the address plus the words Permit application, and construction drawings must also be named with the address or they will not be accepted.
2. Apply through eTrakIt
Building permit applications and revision applications go in through the eTrakIt portal. Once created and uploaded, the permit is assigned to a permit technician who contacts you with further instructions. The city notes that a response may take up to 5 business days. If you do not already have a Box account, the city allows you to open a free individual one to use the Box upload link it provides.
3. Pay the plan check fee
When an application is complete, fees under $25,000 are invoiced by email and paid through the online portal. Amounts over $25,000 require a bank wire, and fees can also be paid in person. Changes to approved plans use a revision statement emailed to permits@redwoodcity.org, followed by a new upload link from your technician.
4. Plan review
The city publishes approximate plan review times. Roofing and sub-permits are handled over the counter. Residential alterations, additions and residential structural review are listed at 3 to 4 weeks, and new buildings at 4 to 8 weeks. These are approximations rather than guarantees, and a correction round adds time, so build the calendar around the longer end if a sale or refinance depends on it.
5. One Stop appointments
Redwood City also offers One Stop plan review appointments, which are held virtually over Zoom. To use one you email your application to permits@redwoodcity.org, pay the plan check fees, upload the plans to your Box link, and then the assigned reviewer contacts you to schedule the appointment.
Permit expiration and extensions
A permit is valid for 365 days from the date of issuance, and every passed field inspection extends it for another 365 days from the inspection date.
A permit issued in the current code cycle, with no complaints or problems on the project, may qualify for a one-time 365-day extension for a fee equal to the current minimum permit fee.
If you inherited a house with a stalled project, check where the permit stands before you decide anything else.
Inspections and construction hours
Inspections are requested through the inspection request line at (650) 780-7361. If you are working as an owner-builder, the city expects the property owner to stand the inspection with the plans, permit and job card ready for the inspector. Contractors must have a qualified employee on site, and the city charges additional inspection fees when an inspection is not ready or the plans and permit card are missing.
Construction is limited to 7 a.m. through 8 p.m. Monday to Friday. Contractors may not work on Saturdays, Sundays or city-observed holidays without advance approval, while residential owners may work on weekends and holidays from 9 a.m. to 5 p.m. Emergency work after hours is allowed.
Permits and selling a Redwood City house
Permit history is one of the first things a careful buyer or lender checks. A house with an expired permit, a missing final or an addition nobody can document tends to attract lower offers or fall out of escrow.
California sellers generally disclose known unpermitted work, and our statewide guide to selling as-is with unpermitted work explains how that works. The seller closing costs guide covers what else to budget for.
If your Redwood City home has open or unfinished permits, you generally have three paths: finish the work and obtain the final inspection before listing, disclose and accept a lower price on the open market, or sell as-is to a cash buyer who takes the property in its current condition. Before choosing, work through this list:
- Look up the permit history for the address and note anything open, expired or never finalized.
- List every improvement made without a permit, such as a converted garage, a finished attic or an added bathroom.
- Collect final inspection records and contractor invoices for work that was permitted.
- Ask the Building Division what legalizing each item would involve, including plans, fees and possible opening of walls.
- Compare that time and cost against a no-repairs sale.
How to sell a house in Redwood City
- Find out which work on the property was permitted and which was not.
- Gather permits, inspection records and any city notices.
- Request a no-obligation cash offer for the house as it stands.
- Pick your closing date.
- Close with no repairs, permit cleanup or showings required.
Our Redwood City cash home buyer page covers the local sale process, and the code enforcement and ADU guides below cover the other rules owners run into.
Own a Redwood City home with unpermitted work? Sell as-is for cash.
Get My Cash OfferFrequently asked questions
Do I need a permit for work in my Redwood City home?
The city says a permit is required for all work not listed as exempt in section 105.2 of the California Building Code. Call the Building Division at (650) 780-7350 if you are unsure.
Can I apply for a Redwood City permit on paper?
No. The city states that it is only accepting electronic permit and plan applications, submitted through eTrakIt.
How long does Redwood City plan review take?
The city lists approximate times of 3 to 4 weeks for residential alterations and additions and 4 to 8 weeks for new buildings, with roofing and sub-permits handled over the counter.
How long is a Redwood City permit valid?
A permit is valid for 365 days from issuance, and each passed field inspection extends it by another 365 days.
What happens if work was done without a permit?
The city says a permit must be obtained to legalize the work, with plans, review and a full inspection, and inspectors may require finishes to be removed to check the work.
Can I sell my Redwood City house with unpermitted work?
Yes. You can disclose it and sell as-is, including to a cash buyer. Our statewide guide explains the disclosure rules.
More guides
- We Buy Houses in Redwood City
- We Buy Houses in San Mateo County
- San Mateo County Property Tax Guide
- Redwood City Code Enforcement Guide
- Redwood City Zoning and ADU Guide
- All California Guides
Sources
- City of Redwood City: Building FAQs
- City of Redwood City: Permit Submittal
- City of Redwood City: Approximate Plan Review Times
- City of Redwood City: Building and Code Enforcement
This guide is general information from public sources, not legal advice. Confirm current rules with the city.