South San Francisco Zoning and ADU Guide for Homeowners
- No repairs or cleanup
- No fees or commissions
- Close on your timeline
Selling a South San Francisco home with an unpermitted ADU?
Get a straight cash offer, as-is, with no legalization required.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team.
South San Francisco allows one ADU and one junior ADU on single-family lots under Municipal Code Section 20.350.003, with a 60-day review clock and a program for pre-approved plans. This guide summarizes the city’s ADU page, the San Mateo County ADU Resource Center’s summary of South San Francisco’s local rules, and the municipal code chapter that governs ADUs.
The county resource is a summary, not the ordinance, so confirm sizes and setbacks with the Planning Division before you design or buy.
South San Francisco ADUs at a glance
| Single-family lot | 1 detached ADU up to 800 sq ft, 1 converted ADU, 1 junior ADU up to 500 sq ft, and one more attached, detached or converted ADU up to 1,000 sq ft under local standards |
| Detached ADU height | 18 feet, or up to 20 feet near major transit |
| Setbacks | 4 feet on the sides and rear |
| Parking | 1 space per ADU or per bedroom, whichever is less, with many exemptions; none for JADUs |
| Owner occupancy | Not required for ADUs; required for a JADU only when it shares sanitation with the main home |
| Short-term rental | ADUs and JADUs may not be rented for fewer than 31 consecutive days |
| Review time | 60 days after the application is complete; 30 days for pre-approved plans |
| Contacts | Planning Division (650) 877-8535, planning@ssfca.gov; Building Division Building@ssfca.gov |
What the city’s ADU page says
The city defines an ADU as a unit with permanent provisions for living, sleeping, eating, cooking and sanitation on the same parcel as a single-family or multifamily dwelling, and it caps a junior ADU at 500 square feet.
Building Division staff review ADU plans within 60 days once the application is deemed complete. The city accepts ADU plans for pre-approval under AB 1332, and once an application using pre-approved plans is complete, the city approves or denies it within 30 days.
Review fees follow the hourly rate in the latest Adopted Master Fee Schedule with a minimum of one hour, and Building@ssfca.gov is the contact for a building permit fee estimate. The Planning Division can be reached at (650) 877-8535.
Unit counts and sizes by lot type
Per the San Mateo County ADU Resource Center summary of Section 20.350.003, a single-unit lot can have one detached ADU up to 800 square feet, one converted ADU and one JADU of up to 500 square feet, and local standards allow one additional attached, detached or converted ADU of up to 1,000 square feet, reduced to 800 if floor area ratio or lot coverage limits are not met.
On existing multifamily lots, detached ADUs are allowed up to eight or the number of existing units, whichever is less, and converted ADUs in non-livable space up to 25 percent of existing units or one, whichever is greater. A proposed multifamily lot can have up to two detached ADUs. A JADU is allowed only within a single-unit dwelling.
Height, setbacks and parking
The summary lists a detached ADU height of 18 feet, or up to 20 feet to match the main home’s roof pitch within a half mile walk of a major transit stop. Setbacks are 4 feet on the street side, interior side and rear, with front setbacks following the zone for local-standards ADUs and waived for state-mandated ADUs. A 4-foot separation applies between an ADU behind the main home and other structures.
Parking is one space per ADU or per bedroom, whichever is less, and may be tandem or in setbacks unless the Chief Planner finds it infeasible. No parking is required in many cases, including within a half mile of transit, in a historic district, for conversions, and when replacing a garage. JADUs need no parking.
Owner occupancy and rentals
The summary says owner occupancy is not required for ADUs, and for JADUs it applies only if the JADU shares sanitation facilities with the main home. ADUs and JADUs may not be rented for less than 31 consecutive days. These are the points buyers and lenders ask about, so keep documentation if you own an existing unit.
Legalizing an older unit before a sale
If you own an older garage conversion or backyard unit with no permit, you have two paths. You can apply to legalize it, which means plans, plan check, inspections and any corrections required to meet current life-safety rules. Or you can disclose the unit and sell as-is.
The city’s ADU page does not describe a separate amnesty program, so ask the Planning and Building Divisions what applies to your unit. A cash buyer can purchase the property with the unit in its current state.
State ADU law and South San Francisco
California’s ADU statute, Government Code section 66314 and following, sets a floor that every city must follow, and local ordinances fill in the details.
The state requires ministerial review within 60 days of a complete application, bars a city from requiring more than a limited set of standards, and generally allows an ADU or conversion inside existing space without added setbacks.
The California Department of Housing and Community Development (HCD) publishes a handbook and keeps a list of the state requirements. Because state law changes often, treat the city’s current ordinance and handout as the final word on size, height, parking and fees for your lot.
ADUs, garage conversions and selling a South San Francisco house
Many older homes have a converted garage or a backyard unit built without permits. Buyers and lenders ask about them, and California sellers generally disclose known unpermitted work. Our guide to selling as-is with unpermitted work explains the rules, and our Prop 13 guide explains how new construction can affect property tax. Before you list:
- Check city records for permits on any ADU, conversion or addition.
- Ask Planning whether the structure could qualify under current rules.
- Estimate plans, fees and corrections needed to legalize it.
- Compare that with selling as-is and letting a cash buyer take on the legalization.
Questions to ask Planning before you design
- Does my lot and zone allow an ADU, a junior ADU, or both?
- Is a pre-approved or pre-reviewed ADU plan available?
- What are the current impact, utility and school fees for the size I am considering?
- Can my existing garage or accessory structure be converted without changing its footprint?
- Are there fire, slope, easement or utility constraints on my lot?
Junior ADUs and garage conversions in more detail
State law treats a junior ADU as a unit of up to 500 square feet created inside the walls of an existing or proposed single-family home, with an efficiency kitchen and a recorded restriction that keeps it from being sold apart from the house.
A garage conversion is a different path: the unit replaces the garage, and state law generally does not require the city to demand replacement parking. Both are common sources of unpermitted space in older South San Francisco neighborhoods, which is why buyers’ agents and appraisers ask for the permit record.
If a conversion was done without a permit, the usual fix is to submit as-built drawings, pay the fees and pass inspection, which can take months and cost real money.
Fees, utilities and property tax
State law limits the impact fees a city can charge on smaller ADUs and on conversions of existing space, and it limits when a separate utility connection can be required.
Larger new units can still carry impact fees, school fees and water or sewer connection charges, so ask for an itemized estimate before you commit to plans. New construction is generally reassessed for property tax under Prop 13, which means an ADU can raise the bill for the whole property. Our Prop 13 guide explains how reassessment works.
Why ADUs matter for resale
A permitted ADU can add rental income and appeal for some buyers, but an unpermitted one can complicate financing and appraisal. Lenders typically want permitted living area, and an appraiser may not count unpermitted space.
Because an ADU generally cannot be sold separately from the main home, its value comes through the sale of the whole property.
If you inherited a house with an old backyard unit, or bought one with a converted garage, check what the city has on file before you decide how to sell. Our probate home sale guide covers inherited property.
How to sell a house in South San Francisco
- Pull the permit record for your address from the Building Division or the city permit portal.
- Gather permits, final inspection sign-offs and any city notices.
- Request a no-obligation cash offer for the house as it stands.
- Choose your closing date.
- Close with no repairs, permit cleanup or showings required.
See also our South San Francisco page, the sell as-is page, the cash offer process, the San Mateo County hub and the San Mateo County recorder and deed transfer guide.
Own a South San Francisco home with an unpermitted ADU? Sell as-is for cash.
Get My Cash OfferFrequently asked questions
How big can an ADU be in South San Francisco?
Per the San Mateo County ADU Resource Center summary of Section 20.350.003, a detached state-mandated ADU can be up to 800 square feet and a local-standards ADU up to 1,000 square feet, subject to floor area and lot coverage limits.
What is a junior ADU?
A unit of up to 500 square feet within a single-unit dwelling. The city’s ADU page uses that 500-square-foot limit.
How long does the city take to review an ADU?
Staff reviews plans within 60 days after the application is deemed complete, or 30 days when pre-approved plans are used, per the city’s ADU page.
Do I need to live on the property?
The county summary says owner occupancy is not required for ADUs and applies to a JADU only when it shares sanitation with the main home.
Can I rent my ADU short term?
No. The summary says ADUs and JADUs may not be rented for fewer than 31 consecutive days.
Can I sell a house with an unpermitted ADU?
Yes. You can disclose it and sell as-is, including to a cash buyer.
More guides
- We Buy Houses in South San Francisco
- We Buy Houses in San Mateo County
- San Mateo County Property Tax Guide
- South San Francisco Building Permits Guide
- South San Francisco Code Enforcement Guide
- Daly City Building Permits Guide
- San Mateo Building Permits Guide
- All California Guides
Sources
- City of South San Francisco: Accessory Dwelling Units
- San Mateo County ADU Resource Center: South San Francisco local rules
- South San Francisco Municipal Code Chapter 20.350: Standards for Specific Uses
- City of South San Francisco: Building Division
This guide is general information from public sources, not legal advice. Confirm current rules, fees and hours with the city.
