Moreno Valley Building Permits Guide for Homeowners and Sellers
- Unpermitted work, open permits, repairs needed: we buy it as-is
- Zero fees, zero commissions, zero closing costs
- No obligation: turn the offer down and owe us nothing
Permit Problems on Your Moreno Valley House? Sell As-Is for Cash
Open permits and unpermitted work do not have to stop a sale. Tell us about the house and get a written cash offer.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from the City of Moreno Valley Community Development Department; sources are listed at the end.
Moreno Valley runs permits, plan review, inspections and code records through one online system called SimpliCITY, and a free account lets you check the status of existing records. If you are selling, reading the history there before you list tells you whether a buyer’s inspector or lender is likely to raise a problem.
Moreno Valley building permits at a glance
| Who handles permits | City of Moreno Valley Building and Safety Division |
| Online system | SimpliCITY, available 24/7; a free account is needed to view record status or start a project |
| Main phone | 951.413.3350 |
| Inspection line | 951.413.3380 |
| Fax | 951.413.3363 |
| permitcounter@moval.org | |
| Inspection scheduling | Next available date shown online; the MoVal 24/7 app can be used |
| Fees | The city publishes a Building and Safety fee schedule |
How do I look up permits on a Moreno Valley property?
Create a free SimpliCITY account and search for the address. The city says the account lets you access the status of existing records or begin a new project, and the system includes a Need Help area with submittal requirements, video tutorials and city forms. If you prefer to talk to someone, the permit counter can be reached at 951.413.3350 or by email.
When you read the history, look for permits that were opened but never finaled, work you know was done that has no permit, and changes that do not match the original plans. An open permit with no final inspection is the one buyers and lenders ask about most.
How do inspections work in Moreno Valley?
The city’s Building and Safety page shows the next available inspection date and links to a guide on scheduling inspections, plus the MoVal 24/7 app. The inspection line is 951.413.3380. An inspection that has passed and been signed off is what moves a permit toward final, so if you are closing out an old permit before a sale, ask the permit counter what remains.
What do permits cost in Moreno Valley?
Costs depend on the project. The city publishes its Building and Safety fee schedule so you can plan, and for ADUs it says plan review, inspection and permit costs vary with the type and size of the unit, special districts annexation fees, fire sprinkler fees where required, and public works grading fees where required. Check the schedule for your project rather than relying on a general estimate.
How permits affect selling a house in Moreno Valley
Permit problems usually come up when a buyer’s inspector or agent notices an addition or conversion that does not match the records, or when a lender asks for proof that finished living space was legally built.
In California, sellers generally must disclose known problems, including work you know was done without a permit. On a traditional listing the usual choices are to finish an open permit, permit the work after the fact, lower the price, or give a credit. Each takes time and money and can move a closing date.
How to sell a house in Moreno Valley with unpermitted work or open permits
- Pull the permit history first. Know what the city shows before you talk to a buyer.
- Write down what you know. Who did the work, when, and whether you have receipts or plans.
- Compare your options. Fix it, sell with a price credit, or sell as-is to a cash buyer who prices the risk in.
- Disclose honestly. A cash offer does not change what you must disclose, but it removes the repair and inspection steps that cause delays.
We buy Moreno Valley houses as they are. Read how selling a house as-is in Moreno Valley works, or see our Moreno Valley cash-offer process. If the house has been cited, read our Moreno Valley code enforcement guide, and for backyard units our Moreno Valley zoning and ADU guide.
Not sure what your permit history means for a sale? Call (424) 435-2326 or request a cash offer. There is no cost and no obligation.
Moreno Valley building permits FAQ
Where can I see permits for a Moreno Valley address?
Use the city’s SimpliCITY system with a free account, or call the permit counter at 951.413.3350.
How do I schedule an inspection in Moreno Valley?
Use the city’s inspection scheduling page or the MoVal 24/7 app, or call the inspection line at 951.413.3380.
Does Moreno Valley publish permit fees?
Yes. The Building and Safety fee schedule is linked from the division’s page.
Can I sell a house in Moreno Valley with an open permit?
Yes. An open permit does not legally stop a sale, but it can slow a traditional one. A cash buyer can purchase the house with the permit still open.
Sources
- City of Moreno Valley: Building and Safety Division
- City of Moreno Valley: SimpliCITY
- City of Moreno Valley: ADU Building FAQ
This guide is general information, not legal advice. Permit rules, fees and hours change; confirm requirements with the City of Moreno Valley.
From the Blog
Latest guides for California home sellers
-

California’s Judicial Foreclosure Redemption Right: The One-Year Window Most Owners Never Hear About
California's rarer judicial foreclosure process comes with a statutory right to redeem the property for up to a year after the sale…
Read the guide → -

Santa Clara County’s Tax-Defaulted Property Auction: How to Claim the Excess Proceeds
When a Santa Clara County home isn't redeemed within the state's deadline, the county can sell it at public auction — and…
Read the guide → -

Pomona’s Rent Stabilization Ordinance Just Became Permanent: What Landlords Must Do Before Selling
Pomona's Ordinance No. 4359 became permanent on January 1, 2026, replacing the city's prior urgency ordinances and capping most rent increases at…
Read the guide → -

Compton’s Substandard Building Ordinance, Explained
Compton can order a dangerous or substandard house secured, repaired, or demolished under Municipal Code Chapter 14, and if the owner misses…
Read the guide → -

Chico’s RECO Inspection: What Sellers of Older Homes Must Fix Before Closing
Chico requires sellers of homes built before July 1, 1991 to pass a RECO energy and water retrofit inspection — or transfer…
Read the guide → -

Emeryville’s Just Cause Eviction Ordinance: Relocation Pay Under Municipal Code 5-40
Emeryville had its own just-cause eviction and relocation-assistance ordinance years before California’s statewide AB 1482 existed, and the local rule is still…
Read the guide → -

Malibu’s Six-Year Rebuild Deadline After the Palisades Fire: Municipal Code 17.60.020(C)
Malibu homeowners rebuilding after the January 2025 Palisades Fire have a hard deadline most residents outside the city have never heard of:…
Read the guide → -

California’s Security Deposit Cap: How AB 12 Limits What Landlords Can Collect
AB 12 caps most California security deposits at one month's rent, with a narrow exception for small landlords — plus new 2025…
Read the guide → -

California Civil Code §4525: The 11 HOA Documents You Must Hand a Buyer Before Closing
California Civil Code §4525 requires sellers inside an HOA to hand buyers 11 specific documents before closing — a list that just…
Read the guide →
