Tustin Building Permits Guide for Homeowners and Sellers
- Unpermitted work, open permits, repairs needed: we buy it as-is
- Zero fees, zero commissions, zero closing costs
- No obligation: turn the offer down and owe us nothing
Permit Problems on Your Tustin House? Sell As-Is for Cash
Open permits and unpermitted work do not have to stop a sale. Tell us about the house and get a written cash offer.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from the City of Tustin; sources are listed at the end.
Tustin’s Building Division counter, at 714-573-3130, has a building technician available to give permit information during normal office hours. The city’s Permits Process page covers grading, building, mechanical, plumbing and electrical projects.
Tustin building permits at a glance
| Who handles it | City of Tustin Community Development, Building Division |
| Permit information | Building Division counter, 714-573-3130 |
| Request an inspection | Call the inspection request line at 714-573-3141 and leave the permit number, project address and your name |
| City Hall | 300 Centennial Way, Tustin, CA 92780; main line 714-573-3000 |
| Forms | The city’s Building and Development page lists building submittal and checklist documents |
How do I check permits on a Tustin property?
Call the Building Division at 714-573-3130 and ask what is on file for the address, and look at the city’s City Records page for records requests. If an addition, garage conversion or remodel has no permit, treat it as unpermitted work.
Why does unpermitted work matter in Tustin?
Tustin’s code enforcement team takes concerns by phone, email and an online form. See our Tustin code enforcement guide.
How permits affect selling a house in Tustin
In California, sellers generally have to disclose known problems, including work you know was done without a permit. On a traditional sale, buyers often ask for a closed-out permit, repairs or a price cut. A cash buyer can purchase the house with the permit problem unresolved and price the risk into the offer.
How to sell a house in Tustin with unpermitted work or open permits
- Check the city record. Call the Building Division about the address.
- List what you know. Who did the work, when, and whether you have receipts or plans.
- Compare options. Finish the permit, sell with a price credit, or sell as-is to a cash buyer.
- Disclose honestly. A cash offer does not change what you must disclose.
We buy Tustin houses as they are. Read selling a house as-is in Tustin or our Tustin cash-offer process.
Not sure what your permit history means for a sale? Call (424) 435-2326 or request a cash offer. No cost, no obligation.
What the city’s Permits Process page covers
The city’s Permits Process page is described as information about grading, building, mechanical, plumbing and electrical projects. That list is a useful way to think about your own property.
A house can carry permits in any of those five categories: a regrade or retaining wall, a structural addition, a furnace or air conditioner replacement, a repiped bathroom or water heater swap, and an electrical panel upgrade.
Walk the property and write down every change in those categories, then ask the Building Division about each. The city’s Building and Development page also lists building submittal and checklist documents, which show what the city expects for a given type of project.
Contacting the right line at City Hall
The city lists the Building Division counter at 714-573-3130, with a building technician available to give permit information during normal office hours. Inspection requests go to a separate line at 714-573-3141, where you leave the permit number, project address and your name.
City Hall is at 300 Centennial Way, Tustin, CA 92780, with a main line of 714-573-3000. Use the counter number for records and permit status questions and the inspection line only when a permit already exists and you are ready for a visit.
Requesting records for a Tustin address
The city has a City Records page for records requests. For a seller, the key point is to ask in writing when the answer will matter later, for example to a buyer’s lender.
A written reply from the Building Division about what is on file for the address, saved with its date, is stronger evidence than a phone conversation. If the answer is that no permit exists for visible work, you know what to disclose.
A Tustin seller’s permit checklist
- List improvements in the city’s five categories: grading, building, mechanical, plumbing and electrical.
- Call 714-573-3130 and ask what is on file for each.
- Ask for records in writing if a buyer or lender is waiting.
- Identify open permits and ask what is needed to finish them, then request an inspection at 714-573-3141 when ready.
- Gather plans and receipts for finished work.
- Choose how to sell. Our California as-is and unpermitted work guide explains disclosure, and the seller closing costs guide shows what a traditional sale costs.
Mistakes to avoid in Tustin
- Assuming a contractor pulled a permit because the invoice mentions one.
- Calling the inspection line before a permit exists.
- Treating a verbal answer from the counter as proof.
- Starting new work on a house you are about to sell without checking the permit rules for it.
More Tustin permit questions
What kinds of projects does Tustin’s permits page cover?
The city describes the page as information about grading, building, mechanical, plumbing and electrical projects.
Where is Tustin City Hall?
The city lists 300 Centennial Way, Tustin, CA 92780, with a main line of 714-573-3000.
Where do I request records in Tustin?
The city has a City Records page for records requests.
Three Tustin situations and how each plays out
A replaced furnace or water heater. Mechanical and plumbing work are two of the five categories on the city’s permits page. Ask the Building Division at 714-573-3130 whether a permit exists.
An older addition. Building additions fall under the city’s building category. If nothing is on file, treat it as unpermitted work and plan your disclosure.
A permit that was opened but never inspected. The inspection line at 714-573-3141 takes permit numbers, so you can request one once you know the permit exists. Ask the counter what must be completed first.
A note on source limits
The city’s permits pages render poorly for automated readers, so this guide relies on the phone numbers, categories and addresses the city lists. Fees, review timelines and forms are not stated here. Confirm those with the Building Division before you plan around them.
Planning the timeline around permit work
Permit work has its own clock: an application, plan review where needed, inspections and corrections. If a closing is near, compare the cost of delay with the discount a cash buyer might ask for taking the house as it is.
Tustin building permits FAQ
Who do I call for Tustin building permit information?
The Building Division counter at 714-573-3130.
How do I request an inspection in Tustin?
Call 714-573-3141 and leave your permit number, project address and name.
Can I sell a house in Tustin with an open permit?
Yes. An open permit does not legally stop a sale, but it can slow a traditional one. A cash buyer can purchase the house with the permit still open.
How do I sell a house in Tustin with unpermitted additions?
Disclose the work, then choose between permitting it, discounting the price, or selling as-is to a cash buyer who accounts for the risk in the offer.
Sources
This guide is general information, not legal advice. Permit rules change; confirm requirements with the City of Tustin.
From the Blog
Latest guides for California home sellers
-

California’s Judicial Foreclosure Redemption Right: The One-Year Window Most Owners Never Hear About
California's rarer judicial foreclosure process comes with a statutory right to redeem the property for up to a year after the sale…
Read the guide → -

Santa Clara County’s Tax-Defaulted Property Auction: How to Claim the Excess Proceeds
When a Santa Clara County home isn't redeemed within the state's deadline, the county can sell it at public auction — and…
Read the guide → -

Pomona’s Rent Stabilization Ordinance Just Became Permanent: What Landlords Must Do Before Selling
Pomona's Ordinance No. 4359 became permanent on January 1, 2026, replacing the city's prior urgency ordinances and capping most rent increases at…
Read the guide → -

Compton’s Substandard Building Ordinance, Explained
Compton can order a dangerous or substandard house secured, repaired, or demolished under Municipal Code Chapter 14, and if the owner misses…
Read the guide → -

Chico’s RECO Inspection: What Sellers of Older Homes Must Fix Before Closing
Chico requires sellers of homes built before July 1, 1991 to pass a RECO energy and water retrofit inspection — or transfer…
Read the guide → -

Emeryville’s Just Cause Eviction Ordinance: Relocation Pay Under Municipal Code 5-40
Emeryville had its own just-cause eviction and relocation-assistance ordinance years before California’s statewide AB 1482 existed, and the local rule is still…
Read the guide → -

Malibu’s Six-Year Rebuild Deadline After the Palisades Fire: Municipal Code 17.60.020(C)
Malibu homeowners rebuilding after the January 2025 Palisades Fire have a hard deadline most residents outside the city have never heard of:…
Read the guide → -

California’s Security Deposit Cap: How AB 12 Limits What Landlords Can Collect
AB 12 caps most California security deposits at one month's rent, with a narrow exception for small landlords — plus new 2025…
Read the guide → -

California Civil Code §4525: The 11 HOA Documents You Must Hand a Buyer Before Closing
California Civil Code §4525 requires sellers inside an HOA to hand buyers 11 specific documents before closing — a list that just…
Read the guide →
