Chico Building Permits Guide for Homeowners and Sellers
- Unpermitted work, open permits, repairs needed: we buy it as-is
- Zero fees, zero commissions, zero closing costs
- No obligation: turn the offer down and owe us nothing
Permit Problems on Your Chico House? Sell As-Is for Cash
Open permits and unpermitted work do not have to stop a sale. Tell us about the house and get a written cash offer.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from City of Chico Building Division pages; sources are listed at the end.
Chico takes permit applications online through its eTRAKiT portal, and the Building Division says all applications, plans and documents must be submitted digitally. If you are selling a Chico house with remodel history, knowing how the city handles permits helps you spot problems before a buyer does.
Chico building permits at a glance
| Office | Building Division, 411 Main Street, Chico, CA 95928 |
| Phone | (530) 879-6700 (Building Division); (530) 896-7200 (front office) |
| Hours | Monday to Friday, 8 a.m. to noon and 1 p.m. to 5 p.m. |
| How to apply | Online through eTRAKiT after registering for a free public account |
| Plans | Submitted digitally; the city does not require paper copies |
| Inspections | Scheduled through eTRAKiT; requests for the next day are cut off at 3 p.m. |
How does a Chico building permit work?
The Building Division reviews applications, runs plan check, issues building and related permits, and inspects the work. You register for a free eTRAKiT account, describe the work clearly (the city gives examples for reroofs, water heaters, HVAC and solar), and pay online.
Contractors applying for the first time need a City of Chico business license and a California contractor’s license number, then call (530) 879-6700 to be set up in eTRAKiT. Construction in the public right-of-way or a public service easement needs a separate encroachment permit.
The division also enforces building, mechanical, energy, accessibility, plumbing, electrical and housing codes, so unpermitted work can lead to a code case. The city’s published schedule says financial transactions are not accepted after 4 p.m., and the permit counter can be unavailable Wednesday mornings from 8 to 9 a.m.
How permits affect selling a house in Chico
Permit issues usually surface when a buyer’s inspector or lender compares the house to the records. In California, sellers generally must disclose known problems, including work done without a permit.
On a traditional listing the usual choices are to close out the permit, apply after the fact, give a credit, or lower the price. Each adds time and cost. For an unpermitted backyard unit, see the city’s process in our Chico zoning and ADU guide.
How to sell a house in Chico with unpermitted work or open permits
- Check the permit status. Search your address in eTRAKiT or call the Building Division at (530) 879-6700.
- Gather what you have. Receipts, plans and inspection records help show what was done and by whom.
- Compare your options. Finish the permit, sell with a credit, or sell as-is to a cash buyer who prices in the risk.
- Disclose honestly. A cash offer does not change what you must disclose, but it removes repair and inspection steps.
We buy Chico houses as they are. Read how selling a house as-is in Chico works, or see our Chico cash-offer process. If the house has received a notice, read our Chico code enforcement guide.
Not sure what your permit history means for a sale? Call (424) 435-2326 or request a cash offer. There is no cost and no obligation.
Which Chico projects need a permit, and which do not?
The Building Division’s FAQ says permits are needed for new construction, additions, alterations, spas, gazebos, patio covers, decks, house moves, most retaining walls and repairs. Separate permits cover electrical, plumbing and mechanical (HVAC) work, re-roofs, and demolition.
Examples the city gives include room additions, covered patios, heaters and air conditioners, fireplace inserts, swimming pools, sewer replacements, water heater replacements and re-roofs. Plumbing permits do not apply to clearing clogs or fixing simple leaks.
The city lists work that does not need a permit, including painting, tiling, carpeting, cabinets and countertops; wood or chain-link fences up to 7 feet; retaining walls or planter boxes up to 4 feet that support nothing else; and a single-story detached shed or playhouse that is 120 square feet or smaller, has no plumbing or electrical, and sits outside setbacks and easements.
How long do permits take and how long do they last?
Re-roofs, water heaters, window replacements and termite repair can be permitted over the counter. For most other projects the city says it can review plans within three weeks of submittal.
A permit generally expires 360 days after issuance if no inspections have been made, and a permit that expires before final inspection leaves the project in violation of city codes. Inspections require an appointment at least one working day ahead, and more in busy construction months.
What happens if work starts without a permit in Chico?
According to the city, an inspector will issue a Stop Work Order, you must apply for the permits and pay fees that can be up to triple the original amount, and covered work may have to be uncovered for inspection before the order is released.
In some cases the code may not allow what was built, and you can be required to restore the area.
Inspections are required before covering floor framing, wall framing, electrical, plumbing and mechanical work, fire sprinklers and roof sheathing, and before pouring concrete or hooking up gas, electric, water and sewer.
Checking a contractor
The city points owners to the Contractors State License Board at 1-800-321-2752 to verify a license. If you are selling and a past contractor never finished the inspections, ask the Building Division what is still open, since an unclosed permit can linger on the record.
Chico building permits FAQ
Where do I apply for a Chico building permit?
Apply online through the city’s eTRAKiT portal after creating a free public account. Contractors setting up for the first time call (530) 879-6700.
Do I need paper plans?
No. The Building Division says it does not require paper copies of plans and asks for digital submittal.
Can I sell a Chico house with an open permit?
Yes. An open permit does not legally stop a sale, but it can slow a traditional one. A cash buyer can purchase the house with the permit still open.
How much more does it cost to get a permit after starting work in Chico?
The city says fees can be up to triple the original amount if you begin construction without the required permit.
How long does a Chico building permit last?
The city says permits generally expire 360 days after issuance if no inspections have been made.
Sources
This guide is general information, not legal advice. Permit rules and hours change; confirm requirements with the City of Chico.
From the Blog
Latest guides for California home sellers
-

California’s Judicial Foreclosure Redemption Right: The One-Year Window Most Owners Never Hear About
California's rarer judicial foreclosure process comes with a statutory right to redeem the property for up to a year after the sale…
Read the guide → -

Santa Clara County’s Tax-Defaulted Property Auction: How to Claim the Excess Proceeds
When a Santa Clara County home isn't redeemed within the state's deadline, the county can sell it at public auction — and…
Read the guide → -

Pomona’s Rent Stabilization Ordinance Just Became Permanent: What Landlords Must Do Before Selling
Pomona's Ordinance No. 4359 became permanent on January 1, 2026, replacing the city's prior urgency ordinances and capping most rent increases at…
Read the guide → -

Compton’s Substandard Building Ordinance, Explained
Compton can order a dangerous or substandard house secured, repaired, or demolished under Municipal Code Chapter 14, and if the owner misses…
Read the guide → -

Chico’s RECO Inspection: What Sellers of Older Homes Must Fix Before Closing
Chico requires sellers of homes built before July 1, 1991 to pass a RECO energy and water retrofit inspection — or transfer…
Read the guide → -

Emeryville’s Just Cause Eviction Ordinance: Relocation Pay Under Municipal Code 5-40
Emeryville had its own just-cause eviction and relocation-assistance ordinance years before California’s statewide AB 1482 existed, and the local rule is still…
Read the guide → -

Malibu’s Six-Year Rebuild Deadline After the Palisades Fire: Municipal Code 17.60.020(C)
Malibu homeowners rebuilding after the January 2025 Palisades Fire have a hard deadline most residents outside the city have never heard of:…
Read the guide → -

California’s Security Deposit Cap: How AB 12 Limits What Landlords Can Collect
AB 12 caps most California security deposits at one month's rent, with a narrow exception for small landlords — plus new 2025…
Read the guide → -

California Civil Code §4525: The 11 HOA Documents You Must Hand a Buyer Before Closing
California Civil Code §4525 requires sellers inside an HOA to hand buyers 11 specific documents before closing — a list that just…
Read the guide →
