Hanford Zoning and ADU Guide for Homeowners and Sellers
- Unpermitted ADU or garage conversion: we buy it as-is
- Zero fees, zero commissions, zero closing costs
- No obligation: turn the offer down and owe us nothing
Backyard Unit on Your Hanford Property? Sell As-Is for Cash
Permitted or not, tell us about the property and get a written cash offer.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from the City of Hanford ADU How-To Guide; sources are listed at the end.
Hanford offers a free Pre-Reviewed ADU Program with plan sets in four sizes, from 375 to 908 square feet. Whether you want to build a unit or you are selling a property that already has one, here is how the city describes the rules.
Hanford ADU rules at a glance
| ADU types | Detached, attached, conversion of existing space, and JADU (up to 500 sq ft inside the home) |
| Single-family lot | One detached ADU, or one attached ADU plus one JADU |
| Multi-family lot | Two detached ADUs, or at least one attached ADU not exceeding 25% of existing units |
| Detached new build | 1,200 sq ft maximum |
| Setbacks | Side and rear 4 ft minimum; none for a conversion in the same location and dimensions |
| Parking | One space per unit, with exceptions in the ordinance |
| Building Division | (559) 585-2581, permithelp@hanfordca.gov |
How do you permit an ADU in Hanford?
The city’s guide lists five steps: confirm eligibility, review the minimum requirements, choose a design route (the Pre-Reviewed ADU Program, a modular company, or a designer or builder), submit the permit application through the Citizen Self Service Portal and pay fees, then complete inspections and final inspection before occupancy.
First plan review takes at least 15 business days and later reviews at least 5 business days. The city says complete applications on properties with an existing home are acted on within 60 days or deemed approved, subject to exceptions in Government Code section 66317.
What fees and requirements apply to a Hanford ADU?
According to the city, there are no impact fees for ADUs under 750 square feet, and larger ADUs may be charged proportionately. School fees apply to ADUs over 500 square feet.
A Title 24 energy report from a certified consultant is required, fire sprinklers are required in the ADU if the main home has them, and solar may be required on new ADUs. Permit fees are in the city’s Master Fee Schedule, so confirm current amounts with the city.
How to sell a Hanford house with an unpermitted unit
- Find out what is on record. Ask the Building Division what permits exist for the address.
- Decide whether to legalize. Legalization can add inspection and repair costs, so weigh it against selling as-is.
- Disclose honestly. Known unpermitted work should be disclosed to buyers.
- Compare offers. A cash buyer prices in the unit and the paperwork risk.
We buy Hanford houses as they are. Read how selling a house as-is in Hanford works, or see our Hanford cash-offer process.
Not sure what an unpermitted unit means for a sale? Call (424) 435-2326 or request a cash offer. There is no cost and no obligation.
The ADU Amnesty Program
The city’s ADU page is titled Accessory Dwelling Units (ADU/JADU) and ADU Amnesty Program, which points to a legalization route for existing unpermitted units. The details were not readable on the pages we could retrieve, so ask the Building Division at (559) 585-2581 or Planning at (559) 585-2580 how the program applies to your unit, what inspections it needs and whether any deadline applies.
Where Hanford sends which question
- Zoning and land use: the Planning Division, (559) 585-2580.
- Permits and inspections: the Building Division, (559) 585-2581 or permithelp@hanfordca.gov.
- General Community Development: (559) 585-2500.
The city also provides a Citizen Self Service Portal for applications and points to the administrative approval and site plan review applications that an ADU requires.
What buyers and lenders ask about an ADU
- Is the unit permitted and finaled, or only built?
- Does it have its own entrance, kitchen and utilities, and is it rented?
- Does the listed square footage include it?
- Was it built under the city’s pre-reviewed plans or a custom design?
A unit that is not on record can be hard to appraise and finance. Our California guide to selling as-is with unpermitted work explains the disclosure side, and our guide to selling a tenant-occupied home covers a rented unit.
Selling a Hanford house with an ADU in progress
If an ADU permit is open and construction is unfinished, buyers will want to see the permit number, the stage of inspection reached, and what remains to be done. A cash buyer can purchase a house with an open ADU permit, but the permit stays on the record until it is finaled or canceled, so ask the Building Division what closing it out would involve.
Hanford zoning and ADU FAQ
How many ADUs can a Hanford single-family lot have?
One detached ADU, or one attached ADU plus one JADU, according to the city’s guide.
How long does Hanford take to review an ADU?
First plan review is at least 15 business days, and the city says complete applications on lots with an existing home are acted on within 60 days or deemed approved, subject to exceptions.
Are there free ADU plans in Hanford?
Yes. The Pre-Reviewed ADU Program offers free plan sets for detached ADUs in four sizes: 375, 550, 743 and 908 square feet.
Who do I call about zoning in Hanford?
The city lists the Planning Division at (559) 585-2580 for zoning verification. Building questions go to (559) 585-2581.
Does Hanford have an amnesty program for unpermitted ADUs?
The city’s ADU page is titled as covering an ADU Amnesty Program. Ask the Building Division how it applies to your unit and what deadlines or inspections apply.
Sources
This guide is general information, not legal advice. ADU rules change; confirm requirements with the City of Hanford.
From the Blog
Latest guides for California home sellers
-

California’s Judicial Foreclosure Redemption Right: The One-Year Window Most Owners Never Hear About
California's rarer judicial foreclosure process comes with a statutory right to redeem the property for up to a year after the sale…
Read the guide → -

Santa Clara County’s Tax-Defaulted Property Auction: How to Claim the Excess Proceeds
When a Santa Clara County home isn't redeemed within the state's deadline, the county can sell it at public auction — and…
Read the guide → -

Pomona’s Rent Stabilization Ordinance Just Became Permanent: What Landlords Must Do Before Selling
Pomona's Ordinance No. 4359 became permanent on January 1, 2026, replacing the city's prior urgency ordinances and capping most rent increases at…
Read the guide → -

Compton’s Substandard Building Ordinance, Explained
Compton can order a dangerous or substandard house secured, repaired, or demolished under Municipal Code Chapter 14, and if the owner misses…
Read the guide → -

Chico’s RECO Inspection: What Sellers of Older Homes Must Fix Before Closing
Chico requires sellers of homes built before July 1, 1991 to pass a RECO energy and water retrofit inspection — or transfer…
Read the guide → -

Emeryville’s Just Cause Eviction Ordinance: Relocation Pay Under Municipal Code 5-40
Emeryville had its own just-cause eviction and relocation-assistance ordinance years before California’s statewide AB 1482 existed, and the local rule is still…
Read the guide → -

Malibu’s Six-Year Rebuild Deadline After the Palisades Fire: Municipal Code 17.60.020(C)
Malibu homeowners rebuilding after the January 2025 Palisades Fire have a hard deadline most residents outside the city have never heard of:…
Read the guide → -

California’s Security Deposit Cap: How AB 12 Limits What Landlords Can Collect
AB 12 caps most California security deposits at one month's rent, with a narrow exception for small landlords — plus new 2025…
Read the guide → -

California Civil Code §4525: The 11 HOA Documents You Must Hand a Buyer Before Closing
California Civil Code §4525 requires sellers inside an HOA to hand buyers 11 specific documents before closing — a list that just…
Read the guide →
