Huntington Park Building Permits Guide for Homeowners
- No repairs or cleanup
- No fees or commissions
- Close on your timeline
Selling a Huntington Park home with permit problems?
Get a straight cash offer, as-is, with no permit cleanup required.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team.
Huntington Park says building plans and permits are required for most residential, commercial and industrial construction, and it runs plan check through its Community Development Department. This guide explains how the city’s permit and plan check process is laid out, who to call, how planning review and building permits fit together, and what permit history means if you plan to sell.
Huntington Park permits at a glance
| Department | Building and Safety Division, Community Development Department, City of Huntington Park |
| Building and Safety phone | (323) 584-6271 |
| Planning Division phone | (323) 584-6210 |
| Planning counter | Monday to Thursday, 7 a.m. to noon |
| City Hall hours | Monday to Thursday, 7 a.m. to 5:30 p.m.; closed Friday |
| Submittal option | Electronic plan check submittal page on the city website |
When permits are required
The city’s Building and Safety page states that building plans and permits are required for most residential, commercial and industrial construction. Its Community Development page describes plan checking for new structures, additions, tenant improvements, remodeling and other proposed construction work.
For a homeowner that covers the jobs that change a house: additions, a converted garage, moved walls, new electrical or plumbing, and detached structures such as a backyard unit. If you are unsure whether a smaller project qualifies, call Building and Safety at (323) 584-6271 before you start.
The plan check and permit process
The city lays out the process as numbered steps on its Plan Check and Permit Process page. The first three, in the order the city lists them, are:
Step 1. Obtain zoning and property information
Start with what the lot allows. Zoning and property information come from the Planning Division, which keeps its counter open Monday to Thursday from 7 a.m. to noon and can be reached at (323) 584-6210.
Step 2. Design your project and draw plans
Plans must be prepared to the city’s requirements. The page includes a note on plans stating that all work must comply with the California Building, Electrical and Plumbing Codes. The edition listed on that page is the 2019 code cycle, so ask the Building and Safety Division which edition applies to a project filed today.
Step 3. Submit plans to Planning and Building
The third step is submitting plans for review. The city offers an Electronic Plan Check Submittal page for sending plans digitally. A project that needs planning approval is processed first by the Planning Division, which is covered next.
Planning approval and the Minor Development Permit
Many home projects need two approvals, one for zoning and one for the building itself.
The city’s Minor Development Permit application says that Minor Development Permit applications are processed by the Planning Division within the Community Development Department, that a site plan is required and is reviewed for zoning compliance, and that most permits also require a building permit from the Building and Safety Division.
The application lists accessory dwelling units, additions to existing structures, new structures and interior-only improvements among the project types, and it states that approval does not include requirements from other departments or agencies, which an applicant must contact directly.
The January 2026 application form shows a fee of $1,200 and says not to submit structural plans with the planning application.
The site plan the city asks for is detailed: property lines, existing and proposed buildings with dimensions, setbacks, parking and driveway, trees to remain or be removed, fences and mechanical equipment, plus a project data table listing the zone district, lot area, floor area, lot coverage, building height and parking. Plan on a measured survey or accurate drawings rather than a hand sketch.
Inspections and final approval
The city’s public pages do not publish inspection windows in a form that is easy to quote, so confirm scheduling with the Building and Safety Division at (323) 584-6271.
In general terms, a permitted job is inspected at stages and ends with a final inspection, and the city’s records should show that the permit was closed. A job without that final is the kind of loose end buyers and lenders notice.
Permits and selling a Huntington Park house
Huntington Park’s code enforcement program specifically targets unpermitted units and building code violations, as our Huntington Park code enforcement guide explains, so permit history deserves attention before a listing. California sellers generally disclose known unpermitted work, which our statewide as-is guide covers, and the seller closing costs guide shows what else comes out of proceeds.
If your Huntington Park home has an open permit or work done without one, owners usually weigh three paths: finish the work and close the permit, disclose it and accept a lower price on the open market, or sell as-is to a cash buyer. A checklist:
- Ask the city for the permit history of the address.
- List any garage conversion, room addition or extra unit with no permit.
- Collect final inspection records and invoices for permitted work.
- Ask Planning and Building what legalizing each item would involve.
- Compare that time and cost with selling the home as it stands.
How to sell a house in Huntington Park
- Find out which work on the property was permitted and which was not.
- Gather permits, inspection records and any city notices.
- Request a no-obligation cash offer for the house as-is.
- Choose your closing date.
- Close without repairs, permit cleanup or showings.
Our Huntington Park cash home buyer page explains how a local sale works.
Own a Huntington Park home with unpermitted work? Sell as-is for cash.
Get My Cash OfferFrequently asked questions
Do I need a permit to build in Huntington Park?
The city says building plans and permits are required for most residential, commercial and industrial construction. Call Building and Safety at (323) 584-6271 if you are unsure.
Who handles zoning questions in Huntington Park?
The Planning Division at (323) 584-6210, whose counter is open Monday to Thursday from 7 a.m. to noon.
What is a Minor Development Permit in Huntington Park?
It is a planning approval processed by the Planning Division for projects such as ADUs, additions and new structures. Most projects also need a separate building permit.
Can I submit plans electronically in Huntington Park?
The city has an Electronic Plan Check Submittal page on its website. Confirm requirements with the Building and Safety Division.
Is City Hall open on Fridays?
The city lists City Hall hours Monday to Thursday, 7 a.m. to 5:30 p.m., and closed on Friday.
Can I sell my Huntington Park house with unpermitted work?
Yes. You can disclose it and sell as-is, including to a cash buyer who takes the property in its current condition.
More guides
- We Buy Houses in Huntington Park
- We Buy Houses in Los Angeles County
- Los Angeles County Property Tax Guide
- Huntington Park Code Enforcement Guide
- Huntington Park Zoning and ADU Guide
- All California Guides
Sources
- City of Huntington Park: Plan Check and Permit Process
- City of Huntington Park: Building and Safety
- City of Huntington Park: Community Development
- City of Huntington Park: Minor Development Permit Application (January 2026)
This guide is general information from public sources, not legal advice. Confirm current rules with the city.
