San Fernando reviews plans and inspects construction through the Building and Safety Division of its Community Development Department at City Hall, and strongly encourages applicants to use its Online Permit Counter. This guide walks San Fernando homeowners through where to apply, what the city’s online portal handles, when inspections happen, and how permit history affects a sale.
The city’s pages do not publish a fee table or review timeline for building permits, so we do not quote one; confirm costs and turnaround with the division before you start work.
San Fernando permits at a glance
| Department | Building and Safety Division, Community Development Department, City of San Fernando |
| Address | City Hall, 117 Macneil Street, San Fernando, CA 91340 |
| Phone | (818) 898-1227 |
| Counter hours | Monday through Thursday, 8:30 a.m. to 12:30 p.m. |
| Inspection hours | Monday through Thursday, 8:30 a.m. to 11:30 a.m. |
| Online applications | Online Permit Counter, which the city strongly encourages for building permit applications and plan check uploads |
| Codes enforced | The city says it enforces the 2022 California Building Code and the 2017 California Fire Code |
What the Building and Safety Division does
According to the city, the division reviews construction plans to confirm they comply with city building, health and safety codes, inspects permitted construction projects, and assists with housing, fire protection and zoning inspections.
For a homeowner that means one office handles the plan check for a remodel, addition or garage conversion and then follows the job through its inspections. Because the counter and the inspection window are open only Monday through Thursday in the morning, plan visits and inspection requests around those hours.
Using the Online Permit Counter
The city asks visitors to use its Online Permit Counter to submit building permit applications and to upload plans for building plan check.
The portal also lists a wide range of other applications, including building, mechanical, electrical and plumbing permits, accessory dwelling unit planning review, site plan review, banners, amplified sound, drain swimming pool permits, utility service and construction meter permits, and weekend work permits.
The city’s page does not spell out step-by-step instructions, required documents or fees, so call the division at (818) 898-1227 if you are unsure which application fits your project.
Step by step: getting a San Fernando permit
1. Decide what kind of permit the work needs
Building, mechanical, electrical and plumbing work are listed as separate application types on the Online Permit Counter. Larger projects such as additions or new units may also need a planning review before building plans are accepted.
2. Apply and upload plans online
Use the Online Permit Counter for the application and for uploading plans to plan check. The city says the division reviews plans for compliance with the codes it enforces.
3. Confirm fees and timing with the city
The city publishes an annual fee schedule on its website, but the building pages we read do not state plan check turnaround or permit expiration. Ask the division for an estimate before committing to a contractor schedule.
4. Get the permit before work starts
Work that begins before a permit is issued is the most common source of code cases and sale delays. A licensed contractor should be able to show you the permit number before they start.
5. Schedule inspections
Inspections are conducted Monday through Thursday from 8:30 a.m. to 11:30 a.m. Keep the approved plans and permit record on site, and save the final sign-off with your closing documents.
Planning around the counter and inspection hours
Because both the permit counter and the inspection window run Monday through Thursday only, and only in the morning, a San Fernando project can lose a week to a missed slot.
Submit through the Online Permit Counter whenever possible, bring the permit card and approved plans to every inspection, and ask your contractor which day they plan to request each inspection.
If you are preparing to sell, ask the division to confirm that every permit on your address is finaled, because an open permit can slow a lender or buyer even when the work itself was done well.
Owners who inherited a house or bought one with past remodeling can request the permit record for the address and compare it with what is actually built.
Permits and selling a San Fernando house
Buyers and lenders ask about permit history, and California sellers generally disclose known unpermitted work on the Transfer Disclosure Statement. Our statewide guide to selling as-is with unpermitted work explains what disclosure involves, and the seller closing costs guide shows what else to budget. If tenants live in the home, read the tenant-occupied home sale guide.
When a San Fernando home has an open permit, an expired one, or work done without a permit, you generally have three options: finish and finalize the permit before listing, disclose the work and negotiate on the open market, or sell as-is to a cash buyer who takes the house in its current condition. Use this checklist:
- Ask the city’s building division for the permit record on your address.
- List every addition, garage conversion, enclosed patio or outbuilding, and note which have permits.
- Gather final inspection records, plans and contractor invoices.
- Ask what plans, fees and inspections it would take to permit each unpermitted item.
- Compare that cost and time with a no-repairs cash sale. New construction can also be reassessed for property tax, which our Prop 13 guide explains.
Questions to ask the San Fernando building division before you start
- Does my project need Planning or Engineering approval in addition to a building permit?
- Is there an exemption that applies, and what conditions come with it?
- What plan-check deposit and fees apply, and how long will review take right now?
- What inspections will be required, and in what order?
- Can an existing unpermitted structure be legalized, and what would that involve?
Common permit mistakes homeowners make
The most common problems are starting work before the permit is issued, letting a permit expire, skipping a required inspection, and assuming a contractor pulled a permit when none exists. Each one can surface years later when a buyer’s agent, appraiser or lender asks for records.
A lapsed or never-finalized permit is easier to resolve while you still own the home and can answer questions from the city. If you are not planning to stay, decide early whether finishing the permit or selling the house as it stands makes more sense.
If you hired a contractor, ask for a copy of the permit and the final inspection record and keep them with your closing documents. A finaled permit is the clearest evidence that the work was inspected. Our capital gains guide also explains how improvement costs may matter when you sell.
How to sell a house in San Fernando
- Ask the city’s Building and Safety Division for the permit record on your address.
- Collect permits, final inspection records and any city notices.
- Request a no-obligation cash offer for the house as it stands.
- Choose your closing date.
- Close with no repairs, permit cleanup or showings required.
See also our San Fernando page, the Los Angeles County hub and the Los Angeles County recorder and deed transfer guide.
Own a San Fernando home with unpermitted work? Sell as-is for cash.
Get My Cash OfferFrequently asked questions
Where is the San Fernando Building and Safety Division?
At City Hall, 117 Macneil Street, San Fernando, CA 91340. The phone number is (818) 898-1227, and the counter is open Monday through Thursday, 8:30 a.m. to 12:30 p.m.
Can I apply for a permit online in San Fernando?
Yes. The city strongly encourages using its Online Permit Counter to submit building permit applications and to upload plans for plan check.
When are inspections done?
The city lists inspections Monday through Thursday, 8:30 a.m. to 11:30 a.m.
Which building codes does San Fernando enforce?
The division’s page says the city enforces the 2022 California Building Code and the 2017 California Fire Code. Confirm the current edition with the division.
Does the city publish permit fees?
The city posts an annual fee schedule, but its Building and Safety page does not list fees. Ask the division for an estimate for your project.
Can I sell my San Fernando house with unpermitted work?
Yes. You can disclose it and sell as-is, including to a cash buyer. Our statewide guide explains the disclosure rules.
More guides
- We Buy Houses in San Fernando
- We Buy Houses in Los Angeles County
- Los Angeles County Property Tax Guide
- San Fernando Code Enforcement Guide
- San Fernando Zoning and ADU Guide
- All California Guides
Sources
- City of San Fernando: Building and Safety
- City of San Fernando: Online Permit Counter
- City of San Fernando: FY 2024/25 fee schedule
This guide is general information from public sources, not legal advice. Confirm current rules, fees and hours with the city.