Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from the City of Victorville; sources are listed at the end.

In Victorville, building permits are applied for, paid for and tracked online through the city’s Citizen Self Service Portal. The Building Department does not accept paper plans at the counter. This guide walks through how that works, how long it takes, what happens when a permit expires, and what it means for you if you are selling a house with work that was never permitted. The Building Department’s phone number is (760) 955-5100.

Victorville permits at a glance

Who handles itCity of Victorville Building Department (Planning handles zoning questions)
How to applyOnline through the Citizen Self Service Portal; paper plans are not accepted at the counter
FeesPaid online through the same portal
First plan reviewAbout 2 to 3 weeks, in the order received (minor projects may be expedited)
Re-review after correctionsAbout 1 week
Permit validity365 days from issue; one extension of up to 180 days may be granted by the Building Official
Inspection hoursMonday to Friday, 8:00 am to 12:00 pm or 1:00 pm to 5:00 pm
Counter hoursMonday to Thursday 8 am to 5 pm; Friday 8 am to 4 pm (City Hall, 14343 Civic Dr.)
Phone(760) 955-5100

Step 1: Create an account on the city portal

Victorville runs permits through an online self-service portal. You create an account, choose the application you need, upload your documents and pay fees there. Because paper plans are not accepted at the counter, everything from plan review to inspection results lives in the portal. If you hire a contractor, ask them to add you as a contact on the permit so you receive the same emails the city sends.

The city’s Planning page also notes that an account must be created and approved before you can access the applications available on the portal, so allow a little time before you plan to submit.

Step 2: Prepare your plans

What you need depends on the project. For new accessory dwelling units (ADUs) and junior ADUs, the city’s plan submittal page lists the documents it expects, which gives a good picture of how detailed a residential submittal can be:

  • A fully dimensioned plot plan showing the parcel number and the points of connection for all utilities
  • Complete architectural and structural plans, plus a roof plan that includes the truss layout
  • Electrical plans, truss calculations, structural calculations and energy calculations
  • Landscape and irrigation plans
  • Residential Green Code mandatory measures, including a Construction Waste Management Plan
  • Photovoltaic plans if the energy calculations require them
  • Fire sprinkler plans and hydraulic calculations, only if the main dwelling has fire sprinklers
  • A grading plan for a detached ADU (for under 50 cubic yards, a plot plan showing elevations and drainage flow lines may be enough)
  • A percolation report or septic tank size if sewer is not available
  • A Joshua tree inspection report, only when square footage is being added

All plans and documents must be drawn to scale and signed by the architect or engineer of record, the contractor or the owner. Smaller jobs such as a patio cover or re-roof need far less, but the principle is the same: the city wants to see exactly what will be built and where.

Step 3: Plan review timing

According to the city, a first building plan review takes roughly two to three weeks. Plans are reviewed in the order they arrive, although minor projects may be expedited. If the reviewer asks for corrections, resubmitted plans, revisions and changes are reviewed in about one week.

That means a project with one round of corrections can easily take a month before a permit is issued, so build that into any sale or refinance timeline.

Step 4: Permit validity and extensions

A Victorville building permit is valid for 365 days from the date it is issued. The city says a permit is typically not treated as expired as long as you keep scheduling inspections and showing progress.

If you need more time, you can submit a Request for Permit or Plan Review Extension to the Building Official, who may grant a one-time extension of up to 180 days. If a permit does expire, you may have to start the process over and pay all applicable fees again.

For a seller, an expired or open permit on record is something a buyer’s inspector or title review may raise, so find out the status before you list.

Open permit or unpermitted work?
You do not have to close it out before you sell. A cash buyer takes the house as it is.
Get My Cash Offer →

Step 5: Inspections

Inspections are scheduled online at any time through the same portal: choose the permit, the inspection type, the date and a morning or afternoon window. Inspectors work Monday through Friday, 8:00 am to 12:00 pm or 1:00 pm to 5:00 pm.

For minor jobs inspected without going inside the house or garage, such as patio covers, decks and re-roofs, nobody has to be home as long as access is available, a ladder is provided if needed and pets are secured.

When the inspector needs to enter the home, an adult aged 18 or older must be present. Results, including the reason for any failed inspection, are emailed to the contacts on the permit as soon as the inspection is done.

Inspectors carry the permit documents on tablets; if you want a signed job card on site, leave a printed copy there.

What if my Victorville work was done without a permit?

Working without building permits is one of the issues the city’s code compliance division lists under residential violations, and the examples it gives include room additions, patios, pools and garage conversions. Start by asking the Building Department what is on file for your address.

If the work was never permitted, the city can tell you what a retroactive permit would involve, which usually means submitting plans and allowing inspections of work that may already be covered by walls. See our Victorville code enforcement guide for how a complaint or notice works.

How missing or open permits affect a sale

California sellers generally have to disclose known unpermitted work. On a traditional sale, a buyer may ask for the work to be permitted, request a credit or lower the price, and a lender’s appraiser may not count space that is missing from city records.

Our California guide to selling as-is with unpermitted work explains the disclosure side in plain English, and the natural hazard disclosure guide covers the other forms most sellers sign.

A cash buyer can purchase with the work unresolved and price the risk into the offer, so you do not have to pay for plans, fees and inspections first.

How to sell a house in Victorville with unpermitted work

  1. Check the records. Ask the Building Department what permits exist for your address and whether any are open or expired.
  2. Get the scope. Find out what legalizing the work would take in plans, fees and time.
  3. Compare your options. Permit it, sell with a repair credit, or sell as-is for cash.
  4. Disclose honestly. A cash offer does not change what you must disclose.
  5. Close on your schedule. With a cash sale there is no lender appraisal to pass, and you pick the closing date.

See selling a house as-is in Victorville, our Victorville cash-offer process, or the seller closing costs guide to compare what each route costs. Planning a backyard unit? Read the Victorville zoning and ADU guide.

Questions about your house? Call (424) 435-2326 or request a cash offer. No cost, no obligation.

Victorville building permits FAQ

How do I apply for a building permit in Victorville?

Through the city’s online Citizen Self Service Portal. Paper plans are not accepted at the Building Department counter.

How long does Victorville plan review take?

The city says a first review takes about two to three weeks, and resubmitted plans are reviewed in about one week.

How long is a Victorville building permit valid?

365 days from the date issued. The Building Official may grant a one-time extension of up to 180 days.

When can I schedule an inspection?

You can request one online at any time. Inspections happen Monday to Friday, 8:00 am to 12:00 pm or 1:00 pm to 5:00 pm.

Does someone need to be home for an inspection?

For minor exterior work, no, if access is available. If the inspector needs to enter the home, an adult 18 or older must be present.

Can I sell a Victorville house with unpermitted work?

Yes, with disclosure. A cash buyer can purchase it as-is and price the risk into the offer.

Sources

This guide is general information, not legal advice. Rules change; confirm requirements with the City of Victorville.