West Hollywood Building Permits Guide for Homeowners

California Cash Home Buyers
Cash Offer in 24 Hours
  • No repairs or cleanup
  • No fees or commissions
  • Close on your timeline

Selling a West Hollywood home with permit problems?

Get a straight cash offer, as-is, with no permit cleanup required.

Call or Text  (424) 435-2326


Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team.

West Hollywood runs its building permits through an online Permit & License Portal, and the Building and Safety Division sits on the second floor of City Hall at 8300 Santa Monica Boulevard. This guide explains when a permit is needed, which small jobs are exempt, how fees and expiration work, how inspections are scheduled, and what permit history means if you plan to sell a West Hollywood property.

West Hollywood permits at a glance

DepartmentBuilding and Safety Division, Community Development Department, City Hall, 8300 Santa Monica Boulevard, second floor
Phone(323) 848-6320 for building staff, plan check and project questions; City Hall main line (323) 848-6400
Emailbuilding@weho.org
How to applyCity of West Hollywood Permit & License Portal (account required); plan check appointments are also offered
AppointmentsWeekdays 8 a.m. to 12 p.m. and 1 p.m. to 5 p.m., 30 minutes each, one property address per appointment
Inspection requestsThrough the portal, from the permit’s Inspections tab; you must be a listed contact on the permit
Inspector line(323) 848-6335 or inspector@weho.org
Process fee$38.60 per permit type, plus fees based on valuation or per item

When you need a building permit in West Hollywood

West Hollywood enforces the California Building Code with Los Angeles County amendments, and the city’s FAQ lists separate building, electrical, plumbing, mechanical, grading and swimming pool permits.

As a rule of thumb, anything that changes the structure of a home, adds or moves plumbing or electrical, or installs new mechanical equipment is permit territory.

Room additions, garage conversions, new bathrooms, re-roofs with structural work, new circuits and panels, new furnaces or air conditioners, and detached structures above the exempt size all belong on that list.

The city also reminds applicants that some projects need review by other City divisions and outside agencies. A remodel in a historic or design-sensitive area, for example, may need planning approval before building plans are accepted, so ask early rather than after you have drawings.

Work the city says does not need a permit

The West Hollywood FAQ publishes the list of exemptions. For building permits it names:

  • A one-story detached accessory building such as a tool shed or playhouse, if the roof area is 120 square feet or less and the height is 12 feet or less (Planning Division review is still required).
  • Fences and walls not over 6 feet high.
  • Retaining walls that hold back no more than 4 feet of earth, unless they carry a surcharge.
  • Flagpoles not on a building and not over 15 feet.
  • Awnings or canopies on a residential building that extend no more than 54 inches from the wall and do not intrude into setbacks.
  • Playground equipment, and light standards up to 30 feet (the wiring still needs an electrical permit).

Electrical exemptions cover minor repairs such as replacing lamps, switches and receptacles, same-type and same-rating breaker replacement, and low-voltage systems under 25 volts.

Plumbing exemptions cover fixing leaks or clearing stoppages in drain, waste and vent piping, and repairing leaks in water piping, valves or fixtures, though replacing piping brings a permit requirement. Mechanical exemptions include portable heating, ventilating and cooling appliances and unit refrigeration systems. When in doubt, call (323) 848-6320 before you start.

Fees, in the city’s own terms

The city charges a $38.60 processing fee on each type of permit. Building permit fees follow the valuation of the work, based on construction cost estimates or an executed contract. Plumbing permits are charged per fixture at $22.60 each, covering items such as a sink, water heater, toilet or shower.

Mechanical permits are $37.60 for each furnace, wall heater, floor heater or air conditioner. Electrical permits use fixed amounts for services, sub-panels and appliances, with new residential buildings charged per square foot.

Grading fees depend on cut or fill volume, and swimming pools are valued at a set cost per square foot. Fees not listed, such as legalizing a unit or a change of occupancy, are charged on an hourly estimate. Fee schedules change, so confirm figures with the city before you budget.

Step by step: how a West Hollywood permit works

1. Prepare

Identify the permit types your scope needs and gather drawings, calculations and any geotechnical reports. The Building and Safety guides and handouts page collects the city’s checklists, and owner-builders have their own Owner-Builder Permit Requirements handout. Hiring a licensed contractor or designer who handles permits regularly usually shortens the process.

2. Apply

Most services run through the Permit & License Portal. The city also offers an e-plan check program and scheduled permitting and plan check appointments. Each appointment is limited to 30 minutes and to one property address, so book separate slots for separate projects. The city also runs an over-the-counter plan review program for limited commercial tenant improvements, which does not apply to most houses.

3. Plan check and corrections

Staff review plans against the adopted codes and return comments. Application timing matters: a plan check application expires if no permit is issued within one year of the application date.

The Building Official may grant up to two extensions of up to 180 days each, on written request showing circumstances beyond your control and payment of an extension fee that may not exceed 25 percent of the plan check fee. After expiration you start over with a new application and fee.

4. Permit issuance and start of work

Once the permit is issued, work must start within 12 months. Under the code section the city cites, a permit becomes void if work is not commenced within 12 months, if work is suspended or abandoned for 180 days, or if no inspection is obtained for 180 days.

The Building Official may extend by up to 180 days on written request and payment of a fee of up to 25 percent of the permit fee. Otherwise an expired permit needs a new full fee to renew.

5. Inspections and final

Open the permit in your portal Dashboard or My Work tab, choose the Inspections tab, select the inspection items and schedule. To cancel, send a request to inspector@weho.org at least one business day before the inspection. A final inspection closes the permit and creates the record buyers and lenders will look for later.

Solar and pre-approved ADU plans

West Hollywood has a dedicated Solar West Hollywood page under plan check services and a Pre-Approved ADU Plan Program for new detached accessory units. Our West Hollywood zoning and ADU guide covers the size and setback rules that apply to those units.

Permits and selling a West Hollywood property

Permit history matters at sale time. Buyers, lenders and appraisers ask whether additions, garage conversions and remodels were permitted, and California sellers generally disclose known unpermitted work. Our statewide guide to selling as-is with unpermitted work explains the disclosure rules, and the seller closing costs guide covers what else to budget.

With open, expired or missing permits you generally have three paths: finish and close the permit before listing, disclose and discount on the open market, or sell as-is to a cash buyer. Before choosing, work through this checklist:

  • Look up your permit history in the city portal and note anything open or expired.
  • List work done without a permit, such as converted garages, enclosed patios or added bathrooms.
  • Collect final inspection records and invoices for permitted work.
  • Ask Building and Safety what it would take to legalize each item, including plans, fees and inspections.
  • Compare that cost and timeline with a no-repairs cash sale.

How to sell a house in West Hollywood

  1. Review which work on the property was permitted and which was not.
  2. Collect permits, final inspection records and any city notices.
  3. Request a no-obligation cash offer for the house as it stands.
  4. Choose your closing date.
  5. Close with no repairs, permit cleanup or showings required.

Our local pages cover related situations in West Hollywood, including our West Hollywood cash buyer page.

Own a West Hollywood property with unpermitted work? Sell as-is for cash.

Get My Cash Offer

Frequently asked questions

Do I need a permit to replace a water heater in West Hollywood?

The city charges plumbing permits per fixture, and a water heater is listed among the fixtures. Confirm your exact project at (323) 848-6320.

Can I build a shed without a permit?

A one-story detached shed with a roof area of 120 square feet or less and a height of 12 feet or less is exempt from a building permit, but Planning Division review is still required.

How do I schedule an inspection?

Use the Inspections tab on the permit in the Permit & License Portal. You must be listed as a contact on the permit.

How long is a permit valid?

The work must start within 12 months, and the permit lapses if work is suspended or abandoned for 180 days or no inspection occurs for 180 days. Extensions of up to 180 days are possible.

What does the city charge to process a permit?

The FAQ lists a $38.60 processing fee per permit type, plus valuation-based or per-item fees.

Can I sell my West Hollywood property with unpermitted work?

Yes. You can disclose it and sell as-is, including to a cash buyer.

More guides

Sources

This guide is general information from public sources, not legal advice. Confirm current rules with the city.