Simi Valley Building Permits Guide for Homeowners and Sellers
- No repairs, no permits to close
- We buy as-is, including unpermitted work
- No agent fees or commissions
Selling a Simi Valley home with permit problems?
Tell us about the property and get a no-obligation cash offer.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from the City of Simi Valley; sources are listed at the end.
In Simi Valley, construction permits are required before building, remodeling or adding to any existing building, and the Building and Safety Division reviews plans and inspects the work.
Simi Valley building permits at a glance
| Who issues permits | City of Simi Valley Building and Safety Division (Environmental Services) |
| Front counter | (805) 583-6723, 2929 Tapo Canyon Road, Simi Valley, CA 93063 |
| Online portal | Online Customer Self Service Portal (plans and inspection requests) |
| Plan review goal | 20 to 25 working days for the initial review and each later review |
| Inspection scheduling | Requests received by 4:00 p.m. are performed the next workday |
| Seismic and wind | Seismic Design Category D or E; 110 mph basic wind speed, exposure B |
What needs a permit in Simi Valley
The City states that construction permits must be obtained before constructing a new building, remodeling, or adding to any existing building. Drawings and supporting documents are reviewed for compliance with the California Building, Electrical, Plumbing, Mechanical and Energy Codes. For a specific project, call the Building and Safety front counter at (805) 583-6723 to confirm whether a permit is required.
Plans for a one-story single-family dwelling, residential garage or accessory structure of conventional wood frame construction and limited structural complexity do not have to be prepared by a California licensed architect or registered engineer. Structurally complex dwellings, steep hillside sites and certain occupancies must have plans prepared by a licensed architect or engineer.
How the permit process works
Plans are submitted through the City’s online self-service portal. The City asks for a full plan set as one PDF (site plan, architectural, structural, mechanical, plumbing, electrical and Title 24 forms), structural calculations stamped by a California registered engineer, and any other supporting documents such as a geotechnical report.
After approval, permits are issued. All permits are valid for a specified amount of time, so confirm the term on your permit.
During construction, inspections follow a typical sequence: foundation, concrete slab, roof and wall sheathing, frame, insulation, drywall nailing, and sewer and water service connection. When changing the use of a building or building a new one, a final inspection and a signed Application for Certificate of Occupancy are required before utilities are released. The owner or contractor must keep a stamped approved plan set (18 by 24 inches) at the job site.
How permits affect selling a Simi Valley home
California sellers must disclose known unpermitted work, and buyers using financing may ask for permit history. An addition or conversion without a final inspection, or a permit that was never closed out, can slow a traditional sale, prompt repair requests or reduce offers. Resolving it means contacting Building and Safety, submitting any required plans, and passing inspections, which takes time and cost.
How to sell a house in Simi Valley with unpermitted work or open permits
- Gather what you know about the work: what was done, when, and by whom.
- Call Building and Safety at (805) 583-6723 to ask about permit records and open permits.
- Decide whether to legalize the work or sell as-is.
- If legalizing, expect plan submittal through the City portal, plan review, and inspections.
- If selling as-is, disclose the work and compare a traditional listing with a cash offer that needs no permits or repairs.
We buy Simi Valley homes as-is. See sell house as-is in Simi Valley, Simi Valley cash home buyers and our cash offer process.
Questions about your property? Call or text (424) 435-2326 or use our contact page.
Simi Valley building permits FAQ
Where do I submit plans in Simi Valley?
Plans are submitted through the City’s Online Customer Self Service Portal as PDF files.
How long does Simi Valley plan review take?
The Division’s goal is 20 to 25 working days for the initial review and for each later review, depending on workload.
Do I need an architect or engineer?
Not for a one-story single-family dwelling, garage or accessory structure of conventional wood frame and limited complexity. Complex dwellings, steep hillsides and certain occupancies require a licensed professional.
How do I schedule an inspection?
Request it through the self-service portal. Requests received by 4:00 p.m. are performed the following workday.
Can I sell my Simi Valley house with unpermitted work?
Yes, with disclosure. Cash buyers such as us purchase as-is, so permits and repairs do not have to be finished before closing.
Sources
- City of Simi Valley: Building and Safety Division
- City of Simi Valley: Building Construction Overview
- City of Simi Valley: Plan Review Procedures
- City of Simi Valley: Inspection Procedures
This guide is general information, not legal or construction advice. Rules change; confirm with the City before acting.
From the Blog
Latest guides for California home sellers
-

California’s Judicial Foreclosure Redemption Right: The One-Year Window Most Owners Never Hear About
California's rarer judicial foreclosure process comes with a statutory right to redeem the property for up to a year after the sale…
Read the guide → -

Santa Clara County’s Tax-Defaulted Property Auction: How to Claim the Excess Proceeds
When a Santa Clara County home isn't redeemed within the state's deadline, the county can sell it at public auction — and…
Read the guide → -

Pomona’s Rent Stabilization Ordinance Just Became Permanent: What Landlords Must Do Before Selling
Pomona's Ordinance No. 4359 became permanent on January 1, 2026, replacing the city's prior urgency ordinances and capping most rent increases at…
Read the guide → -

Compton’s Substandard Building Ordinance, Explained
Compton can order a dangerous or substandard house secured, repaired, or demolished under Municipal Code Chapter 14, and if the owner misses…
Read the guide → -

Chico’s RECO Inspection: What Sellers of Older Homes Must Fix Before Closing
Chico requires sellers of homes built before July 1, 1991 to pass a RECO energy and water retrofit inspection — or transfer…
Read the guide → -

Emeryville’s Just Cause Eviction Ordinance: Relocation Pay Under Municipal Code 5-40
Emeryville had its own just-cause eviction and relocation-assistance ordinance years before California’s statewide AB 1482 existed, and the local rule is still…
Read the guide → -

Malibu’s Six-Year Rebuild Deadline After the Palisades Fire: Municipal Code 17.60.020(C)
Malibu homeowners rebuilding after the January 2025 Palisades Fire have a hard deadline most residents outside the city have never heard of:…
Read the guide → -

California’s Security Deposit Cap: How AB 12 Limits What Landlords Can Collect
AB 12 caps most California security deposits at one month's rent, with a narrow exception for small landlords — plus new 2025…
Read the guide → -

California Civil Code §4525: The 11 HOA Documents You Must Hand a Buyer Before Closing
California Civil Code §4525 requires sellers inside an HOA to hand buyers 11 specific documents before closing — a list that just…
Read the guide →
