San Francisco Building Permits Guide for Homeowners and Sellers
- Unpermitted work, open permits, repairs needed: we buy it as-is
- Zero fees, zero commissions, zero closing costs
- No obligation: turn the offer down and owe us nothing
Permit Problems on Your San Francisco House? Sell As-Is for Cash
Open permits and unpermitted work do not have to stop a sale. Tell us about the house and get a written cash offer.
Last updated November 13, 2026. Reviewed by the Cash Home Buyers CA team. Information comes from SF.gov and the San Francisco Department of Building Inspection; sources are listed at the end.
San Francisco’s Department of Building Inspection (DBI) keeps building permit records going back to 1906 and offers a permit tracking system, so you can see a property’s permit history before you sell. The city also issues a Report of Residential Building Record, known as a 3R report, that owners and realtors can request to see a residential building’s authorized use and permit history.
San Francisco building permit records at a glance
| Who keeps the records | Department of Building Inspection, Records Management Division |
| Building permits | Issued from 1906 to now |
| Building permit job cards | Issued from 1933 to now |
| Electrical, plumbing, mechanical | Electrical from 1986, plumbing from 1976, mechanical from 2008 |
| Status and history online | DBI permit tracking system; a separate PermitSF portal covers certain permit types such as no-plan reroofing and in-kind kitchen and bath work |
| 3R report | Report of Residential Building Record: authorized use and building permit history, available to owners and realtors |
| Plan copies | Require permission from the building owners and the buildings’ design professionals |
| Records email | dbi.records3R@sfgov.org |
How do I look up permits on a San Francisco property?
Start with the DBI permit tracking system, which shows building permit status and history. Permits obtained through the newer PermitSF portal, such as signs and awnings, no-plan reroofing, plumbing and electrical work, and in-kind kitchen and bath replacements, are tracked in a separate search, so check both. For older paper records, DBI Records Management is where building plans, permit applications and job cards are stored.
What is a 3R report in San Francisco?
The 3R report summarizes the authorized use and permit history of a residential building. Owners and realtors can request it from DBI Records Management.
For a seller it is a practical way to see how the city classifies the building, for example how many units are on record, before a buyer’s agent asks.
If what the report shows does not match what is actually on the property, that gap is the thing to sort out first.
How permits affect selling a house in San Francisco
In California, sellers generally have to disclose known problems, including work you know was done without a permit. A buyer’s inspector may notice an extra room, a converted garage or an extra kitchen that the records do not show.
On a traditional sale the usual choices are to close out the permit, legalize the work, cut the price or let the buyer take on the problem, and each costs time. A cash buyer can purchase the house with the permit issue unresolved.
How to sell a house in San Francisco with unpermitted work or open permits
- Pull the permit history. Check DBI’s tracking system and consider a 3R report.
- List what you know. Who did the work, when, and whether you have receipts or plans.
- Compare your options. Close out the permit, sell with a price credit, or sell as-is to a cash buyer who prices the risk in.
- Disclose honestly. A cash offer does not change what you must disclose, but it removes the repair and inspection steps that cause delays.
We buy San Francisco houses as they are, with no permit clean-up, repairs or showings. Read how selling a house as-is in San Francisco works, or see our San Francisco cash-offer process. If the house has been cited, read our San Francisco code enforcement guide, and for extra units see our San Francisco zoning and ADU guide.
Not sure what your permit history means for a sale? Call (424) 435-2326 or request a cash offer. There is no cost and no obligation.
San Francisco building permits FAQ
How far back do San Francisco building permit records go?
Building permits are available from 1906 to now and job cards from 1933. Electrical permits start in 1986, plumbing in 1976 and mechanical in 2008.
Can I get copies of my San Francisco building plans?
Only with permission from the building owners and the buildings’ design professionals. Permit records are easier to get than plans.
Can I sell a house in San Francisco with an open permit?
Yes. An open permit does not legally stop a sale, but it can slow a traditional one. A cash buyer can purchase the house with the permit still open.
How do I sell a house in San Francisco with unpermitted additions?
Disclose the work, then choose between permitting it, discounting the price, or selling as-is to a cash buyer who accounts for the risk in the offer.
Sources
- SF.gov: Request public building records
- SF.gov: Records Management at DBI
- SF.gov: Department of Building Inspection
This guide is general information, not legal advice. Permit rules change; confirm requirements with the San Francisco Department of Building Inspection.
From the Blog
Latest guides for California home sellers
-

California’s Judicial Foreclosure Redemption Right: The One-Year Window Most Owners Never Hear About
California's rarer judicial foreclosure process comes with a statutory right to redeem the property for up to a year after the sale…
Read the guide → -

Santa Clara County’s Tax-Defaulted Property Auction: How to Claim the Excess Proceeds
When a Santa Clara County home isn't redeemed within the state's deadline, the county can sell it at public auction — and…
Read the guide → -

Pomona’s Rent Stabilization Ordinance Just Became Permanent: What Landlords Must Do Before Selling
Pomona's Ordinance No. 4359 became permanent on January 1, 2026, replacing the city's prior urgency ordinances and capping most rent increases at…
Read the guide → -

Compton’s Substandard Building Ordinance, Explained
Compton can order a dangerous or substandard house secured, repaired, or demolished under Municipal Code Chapter 14, and if the owner misses…
Read the guide → -

Chico’s RECO Inspection: What Sellers of Older Homes Must Fix Before Closing
Chico requires sellers of homes built before July 1, 1991 to pass a RECO energy and water retrofit inspection — or transfer…
Read the guide → -

Emeryville’s Just Cause Eviction Ordinance: Relocation Pay Under Municipal Code 5-40
Emeryville had its own just-cause eviction and relocation-assistance ordinance years before California’s statewide AB 1482 existed, and the local rule is still…
Read the guide → -

Malibu’s Six-Year Rebuild Deadline After the Palisades Fire: Municipal Code 17.60.020(C)
Malibu homeowners rebuilding after the January 2025 Palisades Fire have a hard deadline most residents outside the city have never heard of:…
Read the guide → -

California’s Security Deposit Cap: How AB 12 Limits What Landlords Can Collect
AB 12 caps most California security deposits at one month's rent, with a narrow exception for small landlords — plus new 2025…
Read the guide → -

California Civil Code §4525: The 11 HOA Documents You Must Hand a Buyer Before Closing
California Civil Code §4525 requires sellers inside an HOA to hand buyers 11 specific documents before closing — a list that just…
Read the guide →
